Skip to content

CEGR 493 · Capstone II

Welcome back, Account! 👷

Execution of the approved proposal: data collection, engineering design, analysis, results, Chapters 4–5, final report and final defense.

Switch course

Implementation Progress

0%

Modules Completed

0 / 45

Deliverables Logged

0

0 evidence items

Days Remaining

0 Days

Week 5 of 12

Project handoff not yet approved

Import your approved CEGR 492 proposal before starting implementation modules. Scope, objectives and methodology are locked once approved.

Start project handoff
Continue Writing AI Assistant Advisor Feedback FE Civil Review

Chapters 4 & 5

Results and conclusions

Engineering Design

Run designs to code

Visual Manager

Figures, tables, drawings

Project Handoff

Carry over the proposal

Phase Progress

0%Overall
  • Mobilization0%
  • Data & Site0%
  • Design Development0%
  • Analysis & Results0%
  • Documentation0%
  • Review & Defense0%
View design expectations

Phase Completion

  • Mobilization0/6
  • Data & Site0/5
  • Design Development0/12
  • Analysis & Results0/8
  • Documentation0/6
  • Review & Defense0/8
Go to Chapter Builder

Week 5 Focus

Worked examples for this week

Open a deliverable and read its Model write-up tab first — it shows the expected structure, tables and depth before you write your own.

View Weekly Plan

Upcoming Milestones

View All
  • Nov17Poster printed and ready49d
  • Nov18Final document package uploaded for scoring50d
  • Nov18Poster presentation to faculty and industry50d
  • Nov25Oral presentation and defense (scored)57d

Recent Activity

No implementation activity yet. Upload evidence or log a deliverable to start your record.

Phase Completion by Stage

0 of 45 modules

Overall Implementation

0%Week 5 of 12
0 modules certified
0 day study streak · 0h this week

Handoff Status

not started

Scope, objectives and methodology carried from CEGR 492.

Manage handoff

Engineering Work Record

0 design checks passing of 0 recorded.

Deliverable Review Status

No deliverables logged yet. Deliverables appear here once you submit module work.

Weekly Study Time

0h total

Time is recorded automatically while you work inside CEGR 493 workspaces.

Advisor Announcements

View all

Loading advisor activity…

Implementation Completion & Defense

Chapters 4 & 5

0%

0 of 0 chapter modules complete

Defense readiness

0%

0 open committee actions

Deliverables approved

0/0

Design checks passing

0%

Recent Learning Modules

Modules you open appear here so you can jump straight back into the lecture you were reading.

Mobilization

Weeks 1–2

Data & Site

Weeks 3–4

Design Development

Weeks 5–8

Structural Design Development

Wk 5

Size members, verify strength and serviceability limit states, and detail connections.

Deliverable: Structural design package

Geotechnical Design Development

Wk 5

Design foundations, earth-retaining systems and slopes with bearing, settlement and stability checks.

Deliverable: Geotechnical design package

Transportation Design Development

Wk 6

Design geometry, sight distance, pavement sections and traffic operations per AASHTO/MUTCD.

Deliverable: Transportation design package

Water Resources & Hydraulic Design

Wk 6

Size conveyance, storage and treatment elements using hydrologic and hydraulic analysis.

Deliverable: Hydraulic design package

Environmental & Permitting Design

Wk 6

Address water quality, erosion control, permitting and environmental compliance obligations.

Deliverable: Environmental compliance package

Construction Materials Selection

Wk 7

Specify materials with strength, durability and constructability justification.

Deliverable: Material specification schedule

Design Alternatives Analysis

Wk 7

Compare at least three feasible alternatives using weighted decision criteria.

Deliverable: Weighted decision matrix

Design Calculation Package

Wk 7

Assemble stamped-quality calculations: assumptions, references, units, results and checks.

Deliverable: Complete calculation set

Modeling & Simulation

Wk 8

Build, verify and validate the analysis model; document boundary conditions and convergence.

Deliverable: Model report with verification

Code & Standards Compliance

Wk 8

Trace each design decision to the governing code clause and record compliance status.

Deliverable: Code compliance matrix

Engineering Drawings & Details

Wk 8

Produce plan, profile, section and detail sheets with a coordinated drawing index.

Deliverable: Drawing set with index

BIM & Clash Coordination

Wk 8

Federate discipline models, run clash detection and log resolutions.

Deliverable: Clash detection report

Analysis & Results

Weeks 9–10

Documentation

Weeks 10–11

Review & Defense

Weeks 11–12
© 2026 Dr. Steve Efe. Civil Engineering Capstone Studio. All rights reserved.