CEGR 493 · Capstone II
Welcome back, Account! 👷
Execution of the approved proposal: data collection, engineering design, analysis, results, Chapters 4–5, final report and final defense.
Implementation Progress
0%
Modules Completed
0 / 45
Deliverables Logged
0
0 evidence items
Days Remaining
0 Days
Week 5 of 12
Project handoff not yet approved
Import your approved CEGR 492 proposal before starting implementation modules. Scope, objectives and methodology are locked once approved.
Start project handoffChapters 4 & 5
Results and conclusions
Engineering Design
Run designs to code
Visual Manager
Figures, tables, drawings
Project Handoff
Carry over the proposal
Phase Progress
- Mobilization0%
- Data & Site0%
- Design Development0%
- Analysis & Results0%
- Documentation0%
- Review & Defense0%
Phase Completion
- Mobilization0/6
- Data & Site0/5
- Design Development0/12
- Analysis & Results0/8
- Documentation0/6
- Review & Defense0/8
Week 5 Focus
Worked examples for this week
Open a deliverable and read its Model write-up tab first — it shows the expected structure, tables and depth before you write your own.
Upcoming Milestones
- Nov17Poster printed and ready49d
- Nov18Final document package uploaded for scoring50d
- Nov18Poster presentation to faculty and industry50d
- Nov25Oral presentation and defense (scored)57d
Recent Activity
No implementation activity yet. Upload evidence or log a deliverable to start your record.
Phase Completion by Stage
Overall Implementation
Handoff Status
Engineering Work Record
0 design checks passing of 0 recorded.
Deliverable Review Status
No deliverables logged yet. Deliverables appear here once you submit module work.
Weekly Study Time
Time is recorded automatically while you work inside CEGR 493 workspaces.
Advisor Announcements
Loading advisor activity…
Implementation Completion & Defense
Chapters 4 & 5
0%
0 of 0 chapter modules complete
Defense readiness
0%
0 open committee actions
Deliverables approved
0/0
Design checks passing
0%
Recent Learning Modules
Modules you open appear here so you can jump straight back into the lecture you were reading.
Mobilization
Implementation Kickoff
Wk 1Convert the approved proposal into an executable work plan with roles, cadence and success criteria.
Deliverable: Kickoff memo and meeting minutes
Scope Baseline & Control
Wk 1Freeze the approved scope, define scope boundaries and set the change-control threshold.
Deliverable: Scope baseline statement
Team Charter & Responsibility Matrix
Wk 1Define responsibilities with a RACI matrix, decision rules and conflict-resolution protocol.
Deliverable: Signed team charter
Risk Register & Mitigation Plan
Wk 2Identify technical, schedule, safety and data risks; score probability × impact; assign mitigations.
Deliverable: Quantified risk register
Schedule Baseline & Critical Path
Wk 2Build the 12-week CPM schedule, identify the critical path and total float per activity.
Deliverable: CPM schedule with float table
QA/QC & Verification Plan
Wk 2Define calculation checking, model verification, unit audits and independent review gates.
Deliverable: QA/QC plan
Data & Site
Site Investigation Program
Wk 3Plan and document the field investigation: boring layout, sampling depths, in-situ testing and logs.
Deliverable: Site investigation report
Data Collection & Field Records
Wk 3Execute the approved collection protocol with calibrated instruments and traceable field records.
Deliverable: Raw data package with metadata
Survey, GIS & Base Mapping
Wk 3Establish control, reduce survey data and produce the georeferenced base map for design.
Deliverable: Base map and control sheet
Laboratory Testing Program
Wk 4Run standardized tests (ASTM/AASHTO), record deviations and report engineering properties.
Deliverable: Lab test report with ASTM references
Existing Conditions Assessment
Wk 4Document current performance, deficiencies and constraints that govern the design solution.
Deliverable: Existing conditions assessment
Design Development
Structural Design Development
Wk 5Size members, verify strength and serviceability limit states, and detail connections.
Deliverable: Structural design package
Geotechnical Design Development
Wk 5Design foundations, earth-retaining systems and slopes with bearing, settlement and stability checks.
Deliverable: Geotechnical design package
Transportation Design Development
Wk 6Design geometry, sight distance, pavement sections and traffic operations per AASHTO/MUTCD.
Deliverable: Transportation design package
Water Resources & Hydraulic Design
Wk 6Size conveyance, storage and treatment elements using hydrologic and hydraulic analysis.
Deliverable: Hydraulic design package
Environmental & Permitting Design
Wk 6Address water quality, erosion control, permitting and environmental compliance obligations.
Deliverable: Environmental compliance package
Construction Materials Selection
Wk 7Specify materials with strength, durability and constructability justification.
Deliverable: Material specification schedule
Design Alternatives Analysis
Wk 7Compare at least three feasible alternatives using weighted decision criteria.
Deliverable: Weighted decision matrix
Design Calculation Package
Wk 7Assemble stamped-quality calculations: assumptions, references, units, results and checks.
Deliverable: Complete calculation set
Modeling & Simulation
Wk 8Build, verify and validate the analysis model; document boundary conditions and convergence.
Deliverable: Model report with verification
Code & Standards Compliance
Wk 8Trace each design decision to the governing code clause and record compliance status.
Deliverable: Code compliance matrix
Engineering Drawings & Details
Wk 8Produce plan, profile, section and detail sheets with a coordinated drawing index.
Deliverable: Drawing set with index
BIM & Clash Coordination
Wk 8Federate discipline models, run clash detection and log resolutions.
Deliverable: Clash detection report
Analysis & Results
Results Analysis & Interpretation
Wk 9Reduce raw data into engineering findings with tables, figures and interpretation.
Deliverable: Results analysis brief
Statistical Validation
Wk 9Apply hypothesis tests, confidence intervals and goodness-of-fit to validate findings.
Deliverable: Statistical validation memo
Sensitivity & Uncertainty Analysis
Wk 9Vary governing parameters to quantify how design outcomes respond to uncertainty.
Deliverable: Sensitivity study
Performance Evaluation
Wk 9Compare achieved performance against the acceptance criteria set in the proposal.
Deliverable: Performance evaluation table
Sustainability & Resilience Assessment
Wk 10Evaluate life-cycle impact, resilience and sustainability rating criteria.
Deliverable: Sustainability assessment
Cost Estimate & Economic Analysis
Wk 10Develop quantity take-offs, unit costs, contingency and life-cycle cost comparison.
Deliverable: Engineer's estimate
Constructability & Means/Methods
Wk 10Assess sequencing, temporary works, access and construction feasibility.
Deliverable: Constructability review
Safety & Risk Analysis
Wk 10Analyze construction and operational safety hazards with controls per hierarchy.
Deliverable: Safety analysis report
Documentation
Chapter 4 — Results & Design
Wk 10Write the results and design chapter with figures, tables and objective narration.
Deliverable: Chapter 4 draft
Chapter 5 — Conclusions & Recommendations
Wk 11Write conclusions tied to objectives, limitations and recommendations for practice.
Deliverable: Chapter 5 draft
Final Report Assembly
Wk 11Assemble Chapters 1–5 with consistent formatting, numbering and cross-references.
Deliverable: Assembled final report
Appendices & Supporting Data
Wk 11Organize calculations, data sheets, drawings and permits into labeled appendices.
Deliverable: Appendix package
Figures, Tables & Drawing Index
Wk 11Standardize captions, units, scales and the list of figures and tables.
Deliverable: Figure and table register
References & Citation Audit
Wk 11Verify every citation, standard and code reference against the reference list.
Deliverable: Verified reference list
Review & Defense
Advisor Review Cycles
Wk 11Track advisor comments, responses and revision status through to closure.
Deliverable: Comment response matrix
Peer Technical Review
Wk 12Exchange technical review with another team using a structured review checklist.
Deliverable: Peer review report
Final Quality Audit
Wk 12Run the independent check of calculations, drawings, units and code references.
Deliverable: Signed quality audit
Final Defense Preparation
Wk 12Build and rehearse the defense presentation with anticipated question bank.
Deliverable: Defense slide deck
Poster & Exhibition
Wk 12Produce the technical poster for the capstone exhibition.
Deliverable: Technical poster
Final Submission Package
Wk 12Compile every deliverable, signature page and digital file for final submission.
Deliverable: Final submission package
FE Civil Integration Review
Wk 12Map project work to FE Civil exam specifications and close knowledge gaps.
Deliverable: FE readiness map
Project Closeout & Archive
Wk 12Archive data, models and lessons learned for program continuity.
Deliverable: Closeout and lessons-learned memo