CEGR 493 — Capstone II — Spring 2027 plan
34 graded items, 7 milestones. Modules open Monday 12:00 AM and work is due Sunday 11:59 PM (America/New_York).
Week 1
- Approved Proposal and Transition Checklist
- Scope Confirmation
Calendar: Capstone II class meeting · Capstone II startup meeting with advisor
Week 2
Mobilization complete
- Project Execution Plan
- Data and Design Inputs Package
Week 3
Design inputs locked
- Existing Conditions Assessment
- Design Criteria and Standards
Calendar: Data and inputs review
Week 4
- Alternatives Development
- Alternatives Comparison Matrix
- Preliminary Analysis
Week 5
30% design
- 30% Design Package
- Engineering Calculation Package
Calendar: 30% design milestone · Engineering calculation package due
Week 6
- Element Design Register
- Connections and Interfaces Package
- Design Check Matrix
Week 7
60% design
- Verification Package
- Validation Package
- 60% Design Package
Calendar: 60% design milestone
Week 8
- Drawings Package
- Quantity Takeoff
- Cost Estimate
Calendar: Drawings package due
Week 9
Cost and schedule
- Construction Schedule
- Safety Review
- Sustainability Review
- Resilience Review
Calendar: Cost and schedule review
Week 10
90% design
- Constructability Review
- 90% Design Package
- Final Report Draft
Calendar: 90% design milestone
Week 11
- Final Drawings
- Poster
- Presentation
Week 12
Final delivery
- Defense Materials
- Final Capstone Package
- ABET Evidence Portfolio
- Final Reflection
Calendar: Final report deadline · Poster session · Final presentation · Oral defense · ABET evidence deadline