Design Alternatives Analysis

Compare at least three feasible alternatives using weighted decision criteria.

Section progress

0% of the workflow complete

Structural Engineering · Load path, member selection, connections and limit-state verification to AISC, ACI and ASCE 7.

Deliverable: Weighted decision matrix

How to complete this section

0 words saved

Do this next: Read the Design Alternatives Analysis lecture and the worked example so you know what "Weighted decision matrix" has to contain.

Structural Design Office — what this workspace teaches

Load path, member selection, connections and limit-state verification to AISC, ACI and ASCE 7.

  • ASCE 7 load derivation: dead, live, snow, wind and seismic
  • LRFD and ASD load combinations and which governs
  • AISC steel member design: flexure, shear, compression, stability
  • ACI concrete design: flexure, shear, development, detailing
  • Load path and lateral force-resisting systems
  • Connection design: bolted, welded, base plates, force transfer
  • Failure modes: yielding, rupture, buckling, punching, bearing
  • Serviceability: deflection, vibration, drift limits
  • Constructability, durability and structural alternatives

End-of-term milestones

  • Friday, November 20, 2026Poster printed and ready. 36 in × 48 in poster finalized and printed for the faculty and industry showcase — one to two weeks before December.
  • Tuesday, November 24, 2026Final document package uploaded for scoring. Chapters 4–5, calculation package, drawings and appendices uploaded in the app for advisor scoring.
  • Wednesday, November 25, 2026Poster presentation to faculty and industry. Printed 36 in × 48 in poster presented in person; industry reviewers score communication and impact.
  • Wednesday, December 2, 2026Oral presentation and defense (scored). Scored oral presentation two to three days after the end of November.
Week 7
general
Design Development

Design Alternatives Analysis

Compare at least three feasible alternatives using weighted decision criteria.

Section B

Engineering story

A real project situation that frames this module

Week 7: design alternatives analysis is the item standing between the team and a reviewable project record. Compare at least three feasible alternatives using weighted decision criteria. Review stalls on a single line: the team cannot show the record behind apply the approved Capstone I methodology to design alternatives analysis.

All inputs traceable to data, code or the approved proposal. Because document assumptions, governing standards and units for every decision, the error does not stay local: it is carried into the design of record that drawings, quantities and cost are generated from, and every downstream product inherits it before anyone notices.

The owner, the reviewing agency and the engineer of record carry the consequence. On this module specifically, the exposure runs through produce evidence an advisor can verify independently, and the cost of correction rises every week the project record moves closer to issue.

Decisions the engineer must make

  • What record establishes apply the approved Capstone I methodology to design alternatives analysis, and is that record in the project data inventory?
  • Which adopted document governs this decision, and who confirmed it applies in this jurisdiction?
  • What is the acceptance criterion for document assumptions, governing standards and units for every decision, and was it written before the result was known?
  • Is the documented procedure valid for the conditions this project actually presents?
  • If the check fails, does the team revise the project record or raise a change request against the locked baseline?
Three engineers in hard hats and safety vests reviewing drawings on a truck tailgate.

Photo 1. Field review: the conversation in which a scope, a constraint or a decision is actually settled.

Capstone Studio instructional photograph

Section C

Why this matters

Professional

Design Alternatives Analysis is judged on whether an independent engineer can follow your reasoning to the same conclusion. Your weighted decision matrix is the evidence that they can.

Technical

Apply the approved Capstone I methodology to design alternatives analysis controls the numbers this module hands forward. Document assumptions, governing standards and units for every decision determines whether those numbers remain valid once conditions change.

Safety

The failure mode this module guards against is a decision made without a traceable basis. It reaches people through produce evidence an advisor can verify independently, which is why the safety check is recorded explicitly here rather than inferred from a passing strength or performance check.

Economic

The design of record that drawings, quantities and cost are generated from is priced from this work. Quantities, unit costs and schedule float all trace to apply the approved Capstone I methodology to design alternatives analysis; a late correction here is paid for as a change order, not a redline.

Environmental

Environmentally, this module fixes material use, land disturbance and the waste stream generated by rework. Choosing conservatively without justification is not free — the excess shows up as material, energy and land that the project consumes for no measurable gain.

Community

The residents and agencies who inherit the completed work inherit whatever this module decides — performance, accessibility, cost of ownership and resilience are set here, not at the ribbon-cutting.

Section D

Learning objectives

By the end of this module you will be able to:

  1. 1.Explain apply the approved Capstone I methodology to design alternatives analysis, using this project's own conditions rather than a textbook case.
  2. 2.Evaluate document assumptions, governing standards and units for every decision, using this project's own conditions rather than a textbook case.
  3. 3.Interpret produce evidence an advisor can verify independently, using this project's own conditions rather than a textbook case.
  4. 4.Produce weighted decision matrix at a standard the advisor of record would accept without a second revision cycle.

Section E

Instructional content

Full lecture notes with figures and governing equations

Reading design alternatives analysis as a practising engineer

Compare at least three feasible alternatives using weighted decision criteria. That single sentence hides the substance of the module: apply the approved Capstone I methodology to design alternatives analysis, and document assumptions, governing standards and units for every decision. Both must be established from project evidence before anything downstream is credible.

In civil engineering practice, this work is the input to the project record. Produce evidence an advisor can verify independently — which is why this page asks you to record the source of every quantity, not just its value. The design of record that drawings, quantities and cost are generated from depends on it.

  • Apply the approved Capstone I methodology to design alternatives analysis.
  • Document assumptions, governing standards and units for every decision.
  • Produce evidence an advisor can verify independently.
FIGURE 1roof / deckfoundation → soil
Figure 1. Design Alternatives Analysis — annotated engineering schematic showing the governing quantities carried through this module.Read this figure alongside the theory block: every labelled quantity must appear in your calculation package with a unit and a source.
Three engineers in hard hats and safety vests reviewing drawings on a truck tailgate.

Photo 1. Reading design alternatives analysis as a practising engineer in practice — Field review: the conversation in which a scope, a constraint or a decision is actually settled.

Capstone Studio instructional photograph

Decision logic: the procedure that replaces a closed-form solution

Design Alternatives Analysis is governed by a documented procedure rather than a single expression, so the decision logic is the deliverable: what you accept, what you reject, and on what evidence. Apply the approved Capstone I methodology to design alternatives analysis.

Write the acceptance criterion before you look at the result. Document assumptions, governing standards and units for every decision — recording the criterion afterwards lets it be shaped to fit the number you happened to get.

Three engineers in hard hats and safety vests reviewing drawings on a truck tailgate.

Photo 2. Decision logic: the procedure that replaces a closed-form solution in practice — Field review: the conversation in which a scope, a constraint or a decision is actually settled.

Capstone Studio instructional photograph

Constraints, adopted standards and the safety case for design alternatives analysis

No single code section governs this module, so the constraint set comes from the approved proposal, the owner's requirements and professional practice. Write those constraints down; an unwritten constraint is not enforceable at review.

The safety case is explicit here. The failure mode is a decision made without a traceable basis; the people exposed are the owner, the reviewing agency and the engineer of record; the control that prevents it is produce evidence an advisor can verify independently together with an independent check by someone who did not perform the work.

  • Controlling criterion for this module: apply the approved Capstone I methodology to design alternatives analysis.
  • Adopted reference: confirm with the jurisdiction before you rely on it.
  • Failure mode guarded: a decision made without a traceable basis.
  • Evidence produced: Weighted decision matrix.
FIGURE 2Confirm inputs and sourcesSelect governing standardAnalyze / designCheck units and equilibriumIndependent checkAccept or revise
Figure 2. Design Alternatives Analysis — professional workflow from inputs through acceptance.The revise loop is normal. Reviewers expect to see it in your version history.
Three engineers in hard hats and safety vests reviewing drawings on a truck tailgate.

Photo 3. Constraints, adopted standards and the safety case for design alternatives analysis in practice — Field review: the conversation in which a scope, a constraint or a decision is actually settled.

Capstone Studio instructional photograph

Where this method stops being valid

Every method has a domain of validity. State the range of geometry, loading, material behaviour or flow regime over which your approach holds, and state what you would do instead beyond it.

For this project, the boundary you are most likely to push is produce evidence an advisor can verify independently. If you cross it, say so in writing, bound the error, and carry the limitation into your results chapter. A disclosed limitation is professional practice; a silent extrapolation is not.

Concrete cylinder under axial load in a compression testing machine.

Photo 4. Where this method stops being valid in practice — Compression test on a concrete cylinder: the measurement behind every f′c used in design.

Wikimedia Commons, public domain

Section F

Engineering workflow

Steps

  1. 1. Assemble the inputs this module needs — apply the approved Capstone I methodology to design alternatives analysis; document assumptions, governing standards and units for every decision — each with a unit and a source record.
  2. 2. Confirm which document governs, and record who verified that it applies here.
  3. 3. State the assumptions and the acceptance criterion for apply the approved Capstone I methodology to design alternatives analysis.
  4. 4. Execute the documented procedure, recording each judgement and the evidence behind it.
  5. 5. Test the result against produce evidence an advisor can verify independently.
  6. 6. Audit units and run an order-of-magnitude check by hand before the number leaves your desk.
  7. 7. Obtain an independent check from a teammate who did not perform the work, and record their name and date.
  8. 8. Assemble weighted decision matrix and submit it to the advisor of record for review.

Decision points

  • Is every input behind apply the approved Capstone I methodology to design alternatives analysis traceable? If not — stop and collect the record.
  • Does the result satisfy document assumptions, governing standards and units for every decision? If not — revise the work, never the criterion.
  • Would the correction change the design of record that drawings, quantities and cost are generated from? If yes — raise a change-control request before proceeding.
  • Have you ruled out the most common error on this module — all inputs traceable to data, code or the approved proposal?

Quality checklist

  • Documented: apply the approved Capstone I methodology to design alternatives analysis
  • Documented: document assumptions, governing standards and units for every decision
  • Documented: produce evidence an advisor can verify independently
  • Governing document cited
  • Procedure steps recorded in order with evidence
  • Acceptance criterion recorded before the result
  • Independent check signed and dated
  • Weighted decision matrix attached and named per the course convention

Section H

Interactive visualization

Design Alternatives Analysis — step-through

Advance one frame at a time. Each frame adds one engineering decision to the previous state.

Stepwise reveal

Step 1 of 6

Start from the confirmed inputs: geometry, materials, loads or flows, each with a source.

Section I

Applicable codes and standards

Section J

Worked examples

Full engineering solution format

Section K

Common mistakes and how to avoid them

  • All inputs traceable to data, code or the approved proposal
  • Units consistent and dimensionally verified
  • Governing code or standard cited with clause number
  • Independent check performed and initialed
  • Deliverable file attached and named to convention
  • Treating apply the approved Capstone I methodology to design alternatives analysis as a given instead of establishing it from a project record.
  • Producing weighted decision matrix without showing how document assumptions, governing standards and units for every decision was satisfied.
  • Recording the outcome of this module without recording the judgement and evidence that produced it.
  • Missing produce evidence an advisor can verify independently, which is exactly the path to a decision made without a traceable basis.
  • Designing to the average condition when the governing condition is the controlling one.
  • Freezing a design before the constructability and access review that would have changed it.
  • Leaving boundary conditions undefined so the model is not reproducible by an independent checker.
  • Using inputs that no field record, laboratory report, or published source supports.
  • Stopping at output and skipping verification — an unverified number is not an engineering result.

Section L

Industry case study

Documented failure related to design alternatives analysis

A constructed civil works project where this module's decision was made incorrectly or skipped.

Official findings

  • Published investigation identified a breakdown between analysis assumption and constructed condition.

Field observations

  • The controlling assumption was documented nowhere in the design record.
  • No independent check existed at the stage where the error entered the work.

Engineering interpretation

  • Interpretation below is student analysis for instructional purposes, not an official finding.
  • Map the failure to a step in your own workflow and state where your process would have caught it.

Lessons learned

  • Document the assumption, then have someone else check it before it becomes construction.

Source: Summarize the published investigation; cite it in your reference list. Do not reproduce copyrighted report text.

Section M

FE Civil exam connection

Handbook FE Reference Handbook — civil engineering practice section (record the section number from your handbook edition).

Exam topics

Engineering economics — alternative comparison

Handbook formulas

    Weak results here feed your FE Civil Academy weak-area queue for targeted practice.

    Question 1 of 2

    Score: 0/2

    In design alternatives analysis, which item must be established BEFORE the analysis is run?

    Section N

    Apply it to your project — Design Alternatives Analysis

    Complete this using your own capstone project data. Every field is saved to your project record and routed to your advisor with this module's submission.

    Inputs and sources

    Every value needs a traceable source.

    QuantityValueUnitSource / record

    Assumptions and consequences

    AssumptionBasisConsequence if wrong

    Self-check before submission

    Section O

    Design challenge

    Consulting challenge — Design Alternatives Analysis

    Your firm has been retained to deliver the design alternatives analysis scope for a municipal client on a compressed schedule. Produce the technical position your firm would defend at a public meeting.

    Client request: The client wants a defensible recommendation, the basis of design, and an honest statement of what remains unresolved.

    Constraints

    • Adopted local code edition governs; no exceptions without written variance.
    • Budget and schedule are fixed; scope changes require change control.
    • Public safety and accessibility requirements are non-negotiable.

    Deliverables

    • One-page basis of design
    • Supporting calculation extract
    • Risk and limitation statement

    Evaluation

    • Technical correctness
    • Standard compliance
    • Clarity of engineering judgment
    • Honest treatment of uncertainty

    Section P

    Documentation workspace

    Write the report section for this module in the academic editor

    Loading editor…
    0 words

    Section Q

    File uploads

    Accepted: PDF, DOCX, XLSX, CSV, PNG, JPG, ZIP

    No files uploaded yet.

    Section R

    Deliverable and advisor review

    Weighted decision matrix

    Engineering design
    Technical analysis
    Code compliance
    Calculation quality
    Drawings

    Submissions route to your assigned faculty advisor and are scored independently by faculty and administrator rubrics.

    Reflection

    What was the hardest engineering judgment in this module, and how did you resolve it?

    Section S

    ABET outcome mapping

    SO 1
    reinforced

    Weighted decision matrix with advisor review and dual scoring.

    Assessment: Faculty rubric score and administrator rubric score on this module's submission.

    Rubric: Engineering design · Target: 70% of students at or above 'meets expectations'.

    SO 2
    reinforced

    Weighted decision matrix with advisor review and dual scoring.

    Assessment: Faculty rubric score and administrator rubric score on this module's submission.

    Rubric: Engineering design · Target: 70% of students at or above 'meets expectations'.

    Section T

    References and further study

    template

    Design Alternatives Analysis — instructor design procedure

    Course template for the calculation package format expected in the final report appendix.

    manual

    NCEES FE Reference Handbook

    Locate the equations used here and note the handbook section for exam recall.

    template

    Advisor meeting agenda item

    Bring the unresolved decision from this module to your next weekly advisor meeting.

    Week 7 · Weighted decision matrix
    © 2026 Civil Engineering Capstone Studio. All rights reserved.