CEGR 493
Design
Week 5
structural
Structural Design Office
Capstone II dashboard

Parking Garage Design

Designs a parking structure bay for vehicle live load, durability, and long-term exposure requirements.

Section progress

0% of the workflow complete

Structural Engineering · Load path, member selection, connections and limit-state verification to AISC, ACI and ASCE 7.

Deliverable: Parking structure bay design with durability and vehicle live load check.

Minimum tables, figures and equations for Parking Garage Design

Tables — at least 6

  • Table — trial sections or sizes considered, with the capacity of each and the selection decision
  • Table — final selected geometry for every element: dimensions, thickness, grade, spacing, elevation
  • Table — ultimate limit state check summary: demand, capacity, ratio, pass or fail, governing clause
  • Table — serviceability check summary: deflection, crack width, settlement, freeboard or velocity against its limit
  • Table — factors of safety achieved against the factor required, per failure mode
  • Table — strength, service, fatigue and extreme-event checks with ratios

Figures — at least 5

  • Figure — free body diagram of each isolated element, fully labelled with loads, reactions, dimensions and axes
  • Figure — shear and moment (or pressure and velocity) diagrams for each force-carrying element
  • Figure — dimensioned section or plan of each designed element
  • Figure — capacity versus demand plot, interaction diagram, or rating curve as applicable
  • Figure — girder, bearing and substructure elevation with dimensions

Equations — at least 7

  • Equation — equilibrium equations written out for each free body (sum of forces and sum of moments, or continuity and energy)
  • Equation — the internal force relations V(x) and M(x), or the momentum/thrust relation, used to compute each element's demand
  • Equation — the resulting demand at the critical section of each element, with numeric substitution
  • Equation — the capacity expression for each element type, shown with full numeric substitution and units
  • Equation — the sizing criterion that sets the final dimension (for example required area, depth or diameter)
  • Equation — each limit state check written as demand over capacity with numbers substituted
  • Equation — the factor of safety calculation for each failure mode checked

Number every table and figure (Table 4.x, Figure 4.x), caption it, and refer to it by number in your text. Number displayed equations and show the substitution with units. These counts are minimums — add whatever else your design needs.

Engineering documentation standard — required in every Chapter 4 subsection

These rules are graded on every subsection. Work that misses them is capped on technical accuracy, exhibits, codes and communication, whatever the quality of the prose.

Code and standard references

  • Every requirement, factor, coefficient, limit and allowable you apply cites the governing document AND the exact section, article or sub-article number — e.g. ACI 318-19 §22.5.5.1, AISC 360-22 Chapter J, Section J3.6, AASHTO LRFD 10th Ed. Article 3.6.1.2.2, ASCE 7-22 §12.8.1, ASTM D2487, state DOT manual section, local stormwater manual chapter.
  • Give the edition or year of every document the first time it appears, then use a consistent short form.
  • Where a code equation is used, quote the equation number (e.g. Eq. 22.5.5.1) next to your displayed equation.
  • Where you depart from a code provision, state the clause you are departing from and the engineering justification.
  • List every code, standard and manual actually used in a Codes and Standards table at the start of the subsection.

Citations for statements

  • Every statement of fact, value taken from elsewhere, material property, soil parameter, rainfall depth, unit cost or published method carries an in-text citation (APA) to its source.
  • Field and lab data cite the report, boring log, gauge, survey file or test number and its date.
  • Manufacturer data cites the product literature and revision date; software results cite the program, version and model file name.
  • Uncited assertions are treated as assumptions and must appear in the assumptions table with a justification.
  • Every in-text citation resolves to a full entry in the reference list.

Step-by-step calculations

  • Structure every calculation the same way: (1) objective, (2) governing code clause, (3) equation in symbolic form with the equation number, (4) definition of each symbol, (5) numerical substitution, (6) result with units, (7) comparison against the limit and the pass/fail statement.
  • Show the substitution line — never jump from the formula to the answer.
  • Number displayed equations sequentially (Eq. 4.1, 4.2, …) and refer to them by number in the text.
  • State the load or flow combination governing each calculation by name.
  • Carry consistent significant figures and round only at the reported result; state the rounding convention once.
  • Present repetitive element checks in a calculation table with one row per element and the same column order throughout.

Free body diagrams and figures

  • Draw a separate free body diagram for each isolated element — no combined sketches standing in for several members.
  • Dimension every FBD: span, depth, thickness, cover, eccentricity, embedment, slope, pipe diameter, wall height — with the dimension lines and values shown.
  • Label every force, pressure, reaction and moment with its symbol, magnitude and units, and show the sign convention and coordinate axes.
  • Show supports and boundary conditions explicitly (pin, roller, fixed, elastic, buoyant, hydrostatic).
  • Accompany each FBD with its shear, moment, thrust, pressure or hydraulic grade diagram at the same scale reference.
  • Number and caption every figure (Figure 4.x) and refer to it by number in the narrative; add a scale or north arrow to plans.

Units and notation

  • Every number in text, tables, figures and equations carries its unit — no bare numbers.
  • Use one unit system throughout (US customary or SI); if both appear, give the converted value in parentheses consistently.
  • Check dimensional homogeneity of each equation and say so — the units of both sides must match.
  • Provide a nomenclature table defining every symbol with its unit.

Checking and verification

  • Every calculation is checked by an independent route — hand check against software, alternative method, order-of-magnitude estimate, or a published worked example — and the check is shown, not just claimed.
  • Report demand-to-capacity ratios and factors of safety against the required values, with the source clause for each required value.
  • Include a verification/checking table: item, method of check, expected, obtained, difference, accept or revise.
  • Sanity-check every result (magnitude, direction, plausibility) and state the conclusion.
  • Record who checked the work and on what date; flag anything still unverified as an open item.
  • State limitations and the range over which the result is valid.

How to complete this section

0 words saved

Do this next: Read the Parking Garage Design lecture and the worked example so you know what "Parking structure bay design with durability and vehicle live load check." has to contain.

Not sure how to start or how much depth is expected? Read the fully written model example for this deliverable first — it shows the structure, tables and level of justification your advisor grades against.

Structural Design Office — what this workspace teaches

Load path, member selection, connections and limit-state verification to AISC, ACI and ASCE 7.

  • ASCE 7 load derivation: dead, live, snow, wind and seismic
  • LRFD and ASD load combinations and which governs
  • AISC steel member design: flexure, shear, compression, stability
  • ACI concrete design: flexure, shear, development, detailing
  • Load path and lateral force-resisting systems
  • Connection design: bolted, welded, base plates, force transfer
  • Failure modes: yielding, rupture, buckling, punching, bearing
  • Serviceability: deflection, vibration, drift limits
  • Constructability, durability and structural alternatives

End-of-term milestones

  • Tuesday, November 17, 2026 — Poster printed and ready. 36 in × 48 in poster finalized and printed one week before the November 24 showcase.
  • Wednesday, November 18, 2026 — Final document package uploaded for scoring. Chapters 4–5, calculation package, drawings and appendices uploaded in the app for advisor scoring.
  • Wednesday, November 18, 2026 — Poster presentation to faculty and industry. Wednesday poster session — printed 36 in × 48 in poster presented in person; industry reviewers score communication and impact.
  • Wednesday, November 25, 2026 — Oral presentation and defense (scored). Scored oral presentation and defense held on Wednesday, November 25.
Week 5
structural
Structural and Bridge

Parking Garage Design

Designs a parking structure bay for vehicle live load, durability, and long-term exposure requirements.

Section B

Engineering story

A real project situation that frames this module

It is week 5 of implementation and the structural engineering team has reached parking garage design. Designs a parking structure bay for vehicle live load, durability, and long-term exposure requirements. The plan reviewer at the building department asks one question: what establishes that vehicle live loading and reduction per ASCE 7-22 for parking structures?

The team treats post-tensioned or reinforced concrete double-tee/flat plate systems as a background assumption instead of an input that must be established and recorded. The result is an element loaded beyond its governing limit state, discovered only after the design of record that drawings, quantities and cost are generated from has already been built on it.

Building occupants, erection crews and the structural engineer of record carry the consequence. On this module specifically, the exposure runs through durability design, and the cost of correction rises every week the calculation package and framing drawings moves closer to issue.

Decisions the engineer must make

  • What record establishes vehicle live loading and reduction per ASCE 7-22 for parking structures, and is that record in the project data inventory?
  • Does ASCE 7-22 (2022), Table 4.3-1, govern here — and is that the edition adopted by the jurisdiction?
  • What is the acceptance criterion for post-tensioned or reinforced concrete double-tee/flat plate systems, and was it written before the result was known?
  • Is L = 40 psf (passenger vehicle garages, ASCE 7-22 Table 4.3-1) valid over the parameter range this project actually occupies?
  • If the check fails, does the team revise the calculation package and framing drawings or raise a change request against the locked baseline?
Three engineers in hard hats and safety vests reviewing drawings on a truck tailgate.

Photo 1. Field review: the conversation in which a scope, a constraint or a decision is actually settled.

Capstone Studio instructional photograph

Section C

Why this matters

Professional

A licensed engineer defending parking garage design cites ASCE 7-22 (2022), Table 4.3-1, and shows the record behind each input. Your parking structure bay design with durability and vehicle live load check. is reviewed the same way — traceability is assessed before arithmetic.

Technical

Vehicle live loading and reduction per ASCE 7-22 for parking structures is what makes L = 40 psf (passenger vehicle garages, ASCE 7-22 Table 4.3-1) usable on this project rather than a formula copied from a reference. Get it wrong and every quantity derived from it is wrong by the same factor.

Safety

The failure mode this module guards against is an element loaded beyond its governing limit state. It reaches people through fire rating and means-of-egress structural coordination, which is why the safety check is recorded explicitly here rather than inferred from a passing strength or performance check.

Economic

The design of record that drawings, quantities and cost are generated from is priced from this work. Quantities, unit costs and schedule float all trace to vehicle live loading and reduction per ASCE 7-22 for parking structures; a late correction here is paid for as a change order, not a redline.

Environmental

Environmentally, this module fixes embodied carbon in concrete and steel, and the demolition waste of a redesign. Choosing conservatively without justification is not free — the excess shows up as material, energy and land that the project consumes for no measurable gain.

Community

Occupants who rely on the structure performing through its design life and design event inherit whatever this module decides — performance, accessibility, cost of ownership and resilience are set here, not at the ribbon-cutting.

Section D

Learning objectives

By the end of this module you will be able to:

  1. 1.Compare vehicle live loading and reduction per ASCE 7-22 for parking structures, using this project's own conditions rather than a textbook case.
  2. 2.Analyze post-tensioned or reinforced concrete double-tee/flat plate systems, using this project's own conditions rather than a textbook case.
  3. 3.Evaluate durability design, using this project's own conditions rather than a textbook case.
  4. 4.Interpret ramp geometry and structural framing coordination, using this project's own conditions rather than a textbook case.
  5. 5.Compute the governing quantity from L = 40 psf (passenger vehicle garages, ASCE 7-22 Table 4.3-1), with a unit audit on every term.
  6. 6.Apply ASCE 7-22 (2022), Table 4.3-1, and cite the section that governs your acceptance decision.
  7. 7.Produce parking structure bay design with durability and vehicle live load check. at a standard the plan reviewer at the building department would accept without a second revision cycle.

Section E

Instructional content

Full lecture notes with figures and governing equations

The engineering content of parking garage design

Designs a parking structure bay for vehicle live load, durability, and long-term exposure requirements. That single sentence hides the substance of the module: vehicle live loading and reduction per ASCE 7-22 for parking structures, and post-tensioned or reinforced concrete double-tee/flat plate systems. Both must be established from project evidence before anything downstream is credible.

In structural engineering, this work is the input to the calculation package and framing drawings. Durability design — which is why this page asks you to record the source of every quantity, not just its value. The design of record that drawings, quantities and cost are generated from depends on it.

  • Vehicle live loading and reduction per ASCE 7-22 for parking structures
  • Post-tensioned or reinforced concrete double-tee/flat plate systems
  • Durability design: chloride exposure, concrete cover, and corrosion protection
  • Ramp geometry and structural framing coordination
  • Fire rating and means-of-egress structural coordination
FIGURE 1N.A.bh1Double-tee2Post-tensioning tendon3Ramp4Column bay5Expansion joint6Drainage slope
Figure 1. Parking Garage Design — annotated engineering schematic showing the governing quantities carried through this module.Read this figure alongside the theory block: every labelled quantity must appear in your calculation package with a unit and a source.
Reinforcing steel and formwork placed in an excavated bridge footing.

Photo 1. The engineering content of parking garage design in practice — Footing reinforcement and formwork before placement — the physical form of a bearing-capacity calculation.

Wikimedia Commons, public domain

Governing relationships and how they are applied here

The relationships below govern parking garage design. L = 40 psf (passenger vehicle garages, ASCE 7-22 Table 4.3-1) — each is valid only inside the parameter range this project occupies, so state that range before substituting.

Post-tensioned or reinforced concrete double-tee/flat plate systems sets the values you place into these expressions. Any code-prescribed factor must match ASCE 7-22 (2022); a factor lifted from a different edition silently changes the answer.

L = 40 psf (passenger vehicle garages, ASCE 7-22 Table 4.3-1)

  • Uniform live load for parking garage floors, private passenger vehicles
Three engineers in hard hats and safety vests reviewing drawings on a truck tailgate.

Photo 2. Governing relationships and how they are applied here in practice — Field review: the conversation in which a scope, a constraint or a decision is actually settled.

Capstone Studio instructional photograph

Constraints, adopted standards and the safety case for parking garage design

ASCE 7-22 (2022), Table 4.3-1, governs this module: Parking garage live load ACI 318-19 (2019), Ch. 19, adds the second constraint: Durability requirements, exposure classes

The safety case is explicit here. The failure mode is an element loaded beyond its governing limit state; the people exposed are building occupants, erection crews and the structural engineer of record; the control that prevents it is fire rating and means-of-egress structural coordination together with an independent check by someone who did not perform the work.

  • Controlling criterion for this module: vehicle live loading and reduction per ASCE 7-22 for parking structures.
  • Adopted reference: ASCE 7-22 (2022) — cite Table 4.3-1 by number.
  • Failure mode guarded: an element loaded beyond its governing limit state.
  • Evidence produced: Parking structure bay design with durability and vehicle live load check..
FIGURE 2Confirm inputs and sourcesSelect governing standardAnalyze / designCheck units and equilibriumIndependent checkAccept or revise
Figure 2. Parking Garage Design — professional workflow from inputs through acceptance.The revise loop is normal. Reviewers expect to see it in your version history.
Three engineers in hard hats and safety vests reviewing drawings on a truck tailgate.

Photo 3. Constraints, adopted standards and the safety case for parking garage design in practice — Field review: the conversation in which a scope, a constraint or a decision is actually settled.

Capstone Studio instructional photograph

Where this method stops being valid

Every method has a domain of validity. State the range of geometry, loading, material behaviour or flow regime over which your approach holds, and state what you would do instead beyond it.

For this project, the boundary you are most likely to push is fire rating and means-of-egress structural coordination. If you cross it, say so in writing, bound the error, and carry the limitation into your results chapter. A disclosed limitation is professional practice; a silent extrapolation is not.

Concrete cylinder under axial load in a compression testing machine.

Photo 4. Where this method stops being valid in practice — Compression test on a concrete cylinder: the measurement behind every f′c used in design.

Wikimedia Commons, public domain

Section F

Engineering workflow

Steps

  1. 1. Assemble the inputs this module needs — vehicle live loading and reduction per ASCE 7-22 for parking…; post-tensioned or reinforced concrete double-tee/flat plate systems — each with a unit and a source record.
  2. 2. Confirm ASCE 7-22 (2022) is the adopted edition and locate Table 4.3-1.
  3. 3. State the assumptions and the acceptance criterion for vehicle live loading and reduction per ASCE 7-22 for parking structures.
  4. 4. Evaluate L = 40 psf (passenger vehicle garages, ASCE 7-22 Table 4.3-1) term by term, carrying one extra significant figure.
  5. 5. Test the result against durability design.
  6. 6. Audit units and run an order-of-magnitude check by hand before the number leaves your desk.
  7. 7. Obtain an independent check from a teammate who did not perform the work, and record their name and date.
  8. 8. Assemble parking structure bay design with durability and vehicle live load check. and submit it to the plan reviewer at the building department for review.

Decision points

  • Is every input behind vehicle live loading and reduction per ASCE 7-22 for parking structures traceable? If not — stop and collect the record.
  • Does the result satisfy post-tensioned or reinforced concrete double-tee/flat plate systems? If not — revise the work, never the criterion.
  • Would the correction change the design of record that drawings, quantities and cost are generated from? If yes — raise a change-control request before proceeding.

Quality checklist

  • Documented: vehicle live loading and reduction per ASCE 7-22 for parking structures
  • Documented: post-tensioned or reinforced concrete double-tee/flat plate systems
  • Documented: durability design
  • ASCE 7-22 Table 4.3-1 cited by section number
  • Units audited on every expression
  • Acceptance criterion recorded before the result
  • Independent check signed and dated
  • Parking structure bay design with durability and vehicle live load check. attached and named per the course convention

Section H

Interactive visualization

Parking Garage Design — step-through

Advance one frame at a time. Each frame adds one engineering decision to the previous state.

Stepwise reveal

Step 1 of 6

Start from the confirmed inputs: geometry, materials, loads or flows, each with a source.

Section I

Applicable codes and standards

ASCE 7-22

2022 · Table 4.3-1

Adopted design/analysis reference governing this module.

Relevance: Parking garage live load

Reference the section number and edition in your calculation package. Do not reproduce code text.

ACI 318-19

2019 · Ch. 19

Adopted design/analysis reference governing this module.

Relevance: Durability requirements, exposure classes

Reference the section number and edition in your calculation package. Do not reproduce code text.

Section J

Worked examples

Full engineering solution format

Section K

Common mistakes and how to avoid them

  • Treating vehicle live loading and reduction per ASCE 7-22 for parking structures as a given instead of establishing it from a project record.
  • Producing parking structure bay design with durability and vehicle live load check. without showing how post-tensioned or reinforced concrete double-tee/flat plate systems was satisfied.
  • Substituting into L = 40 psf (passenger vehicle garages, ASCE 7-22 Table 4.3-1) outside the range where it is valid, and reporting the number anyway.
  • Missing fire rating and means-of-egress structural coordination, which is exactly the path to an element loaded beyond its governing limit state.
  • Designing to the average condition when the governing condition is the controlling one.
  • Freezing a design before the constructability and access review that would have changed it.
  • Reporting numbers without units, or mixing US customary and SI inside a single calculation chain.
  • Citing the wrong edition of a standard, or citing a standard that does not govern the jurisdiction.
  • Leaving boundary conditions undefined so the model is not reproducible by an independent checker.

Section L

Industry case study

Documented failure related to parking garage design

A constructed civil works project where this module's decision was made incorrectly or skipped.

Official findings

  • Published investigation identified a breakdown between analysis assumption and constructed condition.

Field observations

  • The controlling assumption was documented nowhere in the design record.
  • No independent check existed at the stage where the error entered the work.

Engineering interpretation

  • Interpretation below is student analysis for instructional purposes, not an official finding.
  • Map the failure to a step in your own workflow and state where your process would have caught it.

Lessons learned

  • Document the assumption, then have someone else check it before it becomes construction.

Source: Summarize the published investigation; cite it in your reference list. Do not reproduce copyrighted report text.

Section M

FE Civil exam connection

Handbook FE Reference Handbook — structural engineering section (record the section number from your handbook edition).

Exam topics

structural engineering fundamentals

Handbook formulas

  • L = 40 psf (passenger vehicle garages, ASCE 7-22 Table 4.3-1)

Weak results here feed your FE Civil Academy weak-area queue for targeted practice.

Question 1 of 2

Score: 0/2

In parking garage design, which item must be established BEFORE the analysis is run?

Section N

Apply it to your project — Parking Garage Design

Complete this using your own capstone project data. Every field is saved to your project record and routed to your advisor with this module's submission.

Inputs and sources

Every value needs a traceable source.

QuantityValueUnitSource / record

Assumptions and consequences

AssumptionBasisConsequence if wrong

Self-check before submission

Section O

Design challenge

Consulting challenge — Parking Garage Design

Your firm has been retained to deliver the parking garage design scope for a municipal client on a compressed schedule. Produce the technical position your firm would defend at a public meeting.

Client request: The client wants a defensible recommendation, the basis of design, and an honest statement of what remains unresolved.

Constraints

  • Adopted local code edition governs; no exceptions without written variance.
  • Budget and schedule are fixed; scope changes require change control.
  • Public safety and accessibility requirements are non-negotiable.

Deliverables

  • One-page basis of design
  • Supporting calculation extract
  • Risk and limitation statement

Evaluation

  • Technical correctness
  • Standard compliance
  • Clarity of engineering judgment
  • Honest treatment of uncertainty

Section P

Documentation workspace

Write the report section for this module in the academic editor

Loading editor…
0 words

Section Q

File uploads

Accepted: PDF, DOCX, XLSX, CSV, PNG, JPG, ZIP

No files uploaded yet.

Section R

Deliverable and advisor review

Parking structure bay design with durability and vehicle live load check.

Engineering design
Technical analysis
Code compliance
Calculation quality
Drawings

Submissions route to your assigned faculty advisor and are scored independently by faculty and administrator rubrics.

Reflection

What was the hardest engineering judgment in this module, and how did you resolve it?

Section S

ABET outcome mapping

SO 1
CE-PC1
reinforced

Parking structure bay design with durability and vehicle live load check. with advisor review and dual scoring.

Assessment: Faculty rubric score and administrator rubric score on this module's submission.

Rubric: Engineering design · Target: 70% of students at or above 'meets expectations'.

Section T

References and further study

standard

ASCE 7-22 (2022)

Adopted reference — cite section numbers, do not reproduce text.

standard

ACI 318-19 (2019)

Adopted reference — cite section numbers, do not reproduce text.

template

Parking Garage Design — instructor design procedure

Course template for the calculation package format expected in the final report appendix.

manual

NCEES FE Reference Handbook

Locate the equations used here and note the handbook section for exam recall.

template

Advisor meeting agenda item

Bring the unresolved decision from this module to your next weekly advisor meeting.

Week 5 · Parking structure bay design with durability and vehicle live load check.