Capstone II dashboard

Mat Foundations

Designs a mat (raft) foundation for a structure with high loads or poor/variable bearing soil.

Section progress

0% of the workflow complete

Geotechnical Engineering · Soil properties, foundation selection, bearing, settlement, earth pressure and slope stability.

Deliverable: Mat foundation design calculation with subgrade modulus basis and differential settlement estimate.

Minimum tables, figures and equations for Mat Foundations

Tables — at least 7

  • Table — trial sections or sizes considered, with the capacity of each and the selection decision
  • Table — final selected geometry for every element: dimensions, thickness, grade, spacing, elevation
  • Table — bearing capacity and footing or pile size at each location
  • Table — ultimate limit state check summary: demand, capacity, ratio, pass or fail, governing clause
  • Table — serviceability check summary: deflection, crack width, settlement, freeboard or velocity against its limit
  • Table — factors of safety achieved against the factor required, per failure mode
  • Table — settlement (immediate and consolidation) against the tolerable limit

Figures — at least 4

  • Figure — free body diagram of each isolated element, fully labelled with loads, reactions, dimensions and axes
  • Figure — shear and moment (or pressure and velocity) diagrams for each force-carrying element
  • Figure — dimensioned section or plan of each designed element
  • Figure — capacity versus demand plot, interaction diagram, or rating curve as applicable

Equations — at least 8

  • Equation — equilibrium equations written out for each free body (sum of forces and sum of moments, or continuity and energy)
  • Equation — the internal force relations V(x) and M(x), or the momentum/thrust relation, used to compute each element's demand
  • Equation — the resulting demand at the critical section of each element, with numeric substitution
  • Equation — the capacity expression for each element type, shown with full numeric substitution and units
  • Equation — the sizing criterion that sets the final dimension (for example required area, depth or diameter)
  • Equation — each limit state check written as demand over capacity with numbers substituted
  • Equation — the factor of safety calculation for each failure mode checked
  • Equation — sliding, overturning, bearing and global stability factors of safety

Number every table and figure (Table 4.x, Figure 4.x), caption it, and refer to it by number in your text. Number displayed equations and show the substitution with units. These counts are minimums — add whatever else your design needs.

Engineering documentation standard — required in every Chapter 4 subsection

These rules are graded on every subsection. Work that misses them is capped on technical accuracy, exhibits, codes and communication, whatever the quality of the prose.

Code and standard references

  • Every requirement, factor, coefficient, limit and allowable you apply cites the governing document AND the exact section, article or sub-article number — e.g. ACI 318-19 §22.5.5.1, AISC 360-22 Chapter J, Section J3.6, AASHTO LRFD 10th Ed. Article 3.6.1.2.2, ASCE 7-22 §12.8.1, ASTM D2487, state DOT manual section, local stormwater manual chapter.
  • Give the edition or year of every document the first time it appears, then use a consistent short form.
  • Where a code equation is used, quote the equation number (e.g. Eq. 22.5.5.1) next to your displayed equation.
  • Where you depart from a code provision, state the clause you are departing from and the engineering justification.
  • List every code, standard and manual actually used in a Codes and Standards table at the start of the subsection.

Citations for statements

  • Every statement of fact, value taken from elsewhere, material property, soil parameter, rainfall depth, unit cost or published method carries an in-text citation (APA) to its source.
  • Field and lab data cite the report, boring log, gauge, survey file or test number and its date.
  • Manufacturer data cites the product literature and revision date; software results cite the program, version and model file name.
  • Uncited assertions are treated as assumptions and must appear in the assumptions table with a justification.
  • Every in-text citation resolves to a full entry in the reference list.

Step-by-step calculations

  • Structure every calculation the same way: (1) objective, (2) governing code clause, (3) equation in symbolic form with the equation number, (4) definition of each symbol, (5) numerical substitution, (6) result with units, (7) comparison against the limit and the pass/fail statement.
  • Show the substitution line — never jump from the formula to the answer.
  • Number displayed equations sequentially (Eq. 4.1, 4.2, …) and refer to them by number in the text.
  • State the load or flow combination governing each calculation by name.
  • Carry consistent significant figures and round only at the reported result; state the rounding convention once.
  • Present repetitive element checks in a calculation table with one row per element and the same column order throughout.

Free body diagrams and figures

  • Draw a separate free body diagram for each isolated element — no combined sketches standing in for several members.
  • Dimension every FBD: span, depth, thickness, cover, eccentricity, embedment, slope, pipe diameter, wall height — with the dimension lines and values shown.
  • Label every force, pressure, reaction and moment with its symbol, magnitude and units, and show the sign convention and coordinate axes.
  • Show supports and boundary conditions explicitly (pin, roller, fixed, elastic, buoyant, hydrostatic).
  • Accompany each FBD with its shear, moment, thrust, pressure or hydraulic grade diagram at the same scale reference.
  • Number and caption every figure (Figure 4.x) and refer to it by number in the narrative; add a scale or north arrow to plans.

Units and notation

  • Every number in text, tables, figures and equations carries its unit — no bare numbers.
  • Use one unit system throughout (US customary or SI); if both appear, give the converted value in parentheses consistently.
  • Check dimensional homogeneity of each equation and say so — the units of both sides must match.
  • Provide a nomenclature table defining every symbol with its unit.

Checking and verification

  • Every calculation is checked by an independent route — hand check against software, alternative method, order-of-magnitude estimate, or a published worked example — and the check is shown, not just claimed.
  • Report demand-to-capacity ratios and factors of safety against the required values, with the source clause for each required value.
  • Include a verification/checking table: item, method of check, expected, obtained, difference, accept or revise.
  • Sanity-check every result (magnitude, direction, plausibility) and state the conclusion.
  • Record who checked the work and on what date; flag anything still unverified as an open item.
  • State limitations and the range over which the result is valid.

How to complete this section

0 words saved

Do this next: Read the Mat Foundations lecture and the worked example so you know what "Mat foundation design calculation with subgrade modulus basis and differential settlement estimate." has to contain.

Not sure how to start or how much depth is expected? Read the fully written model example for this deliverable first — it shows the structure, tables and level of justification your advisor grades against.

Geotechnical Design Office — what this workspace teaches

Soil properties, foundation selection, bearing, settlement, earth pressure and slope stability.

  • Reading boring logs and building a design soil profile
  • Soil classification, index properties and strength parameters
  • Shallow foundation bearing capacity (Terzaghi, Meyerhof) and factors of safety
  • Immediate, consolidation and secondary settlement
  • Lateral earth pressure: at-rest, active, passive; Rankine and Coulomb
  • Retaining wall stability: sliding, overturning, bearing, global
  • Deep foundations: pile capacity, skin friction, end bearing, group effects
  • Slope stability methods and required factors of safety
  • Ground improvement and groundwater control

End-of-term milestones

  • Tuesday, November 17, 2026 — Poster printed and ready. 36 in × 48 in poster finalized and printed one week before the November 24 showcase.
  • Wednesday, November 18, 2026 — Final document package uploaded for scoring. Chapters 4–5, calculation package, drawings and appendices uploaded in the app for advisor scoring.
  • Wednesday, November 18, 2026 — Poster presentation to faculty and industry. Wednesday poster session — printed 36 in × 48 in poster presented in person; industry reviewers score communication and impact.
  • Wednesday, November 25, 2026 — Oral presentation and defense (scored). Scored oral presentation and defense held on Wednesday, November 25.
Week 5
geotechnical
Geotechnical

Mat Foundations

Designs a mat (raft) foundation for a structure with high loads or poor/variable bearing soil.

Section B

Engineering story

A real project situation that frames this module

A geotechnical engineering team hits mat foundations in week 5, with the subsurface interpretation and foundation recommendation already promised to the owner. Designs a mat (raft) foundation for a structure with high loads or poor/variable bearing soil. The reviewer starts at the end and works backwards, and the chain breaks at rigid vs.

The team treats modulus of subgrade reaction ks and its estimation as a background assumption instead of an input that must be established and recorded. The result is settlement, bearing failure or slope instability below the finished grade, discovered only after the design of record that drawings, quantities and cost are generated from has already been built on it.

Adjacent property owners, excavation crews and the geotechnical engineer of record carry the consequence. On this module specifically, the exposure runs through differential settlement control across the mat, and the cost of correction rises every week the subsurface interpretation and foundation recommendation moves closer to issue.

Decisions the engineer must make

  • What record establishes rigid vs, and is that record in the project data inventory?
  • Does ACI 318-19 (2019), Ch. 13, govern here — and is that the edition adopted by the jurisdiction?
  • What is the acceptance criterion for modulus of subgrade reaction ks and its estimation, and was it written before the result was known?
  • Is ks = qallow/Δallow (approx.) or from plate load test valid over the parameter range this project actually occupies?
  • If the check fails, does the team revise the subsurface interpretation and foundation recommendation or raise a change request against the locked baseline?
Truck-mounted drill rig taking a soil boring beside a bridge, with sample jars in the foreground.

Photo 1. Subsurface investigation: SPT samples and the boring log that every geotechnical number traces back to.

Capstone Studio instructional photograph

Section C

Why this matters

Professional

A licensed engineer defending mat foundations cites ACI 318-19 (2019), Ch. 13, and shows the record behind each input. Your mat foundation design calculation with subgrade modulus basis and differential settlement estimate. is reviewed the same way — traceability is assessed before arithmetic.

Technical

Rigid vs is what makes ks = qallow/Δallow (approx.) or from plate load test usable on this project rather than a formula copied from a reference. Get it wrong and every quantity derived from it is wrong by the same factor.

Safety

The failure mode this module guards against is settlement, bearing failure or slope instability below the finished grade. It reaches people through mat thickness and two-way reinforcement design, which is why the safety check is recorded explicitly here rather than inferred from a passing strength or performance check.

Economic

The design of record that drawings, quantities and cost are generated from is priced from this work. Quantities, unit costs and schedule float all trace to rigid vs; a late correction here is paid for as a change order, not a redline.

Environmental

Environmentally, this module fixes spoil handling, dewatering discharge and groundwater drawdown near the site. Choosing conservatively without justification is not free — the excess shows up as material, energy and land that the project consumes for no measurable gain.

Community

Mat and deep foundation designs for tall structures require conservative, well-documented settlement predictions with monitoring Neighbors whose structures, utilities and streets sit within the zone of influence live with that outcome long after the semester ends.

Section D

Learning objectives

By the end of this module you will be able to:

  1. 1.Apply rigid vs, using this project's own conditions rather than a textbook case.
  2. 2.Analyze modulus of subgrade reaction ks and its estimation, using this project's own conditions rather than a textbook case.
  3. 3.Analyze differential settlement control across the mat, using this project's own conditions rather than a textbook case.
  4. 4.Explain punching shear checks at heavily loaded columns, using this project's own conditions rather than a textbook case.
  5. 5.Compute the governing quantity from ks = qallow/Δallow (approx.) or from plate load test, with a unit audit on every term.
  6. 6.Apply ACI 318-19 (2019), Ch. 13, and cite the section that governs your acceptance decision.
  7. 7.Produce mat foundation design calculation with subgrade modulus basis and differential settlement estimate. at a standard the geotechnical reviewer for the owner would accept without a second revision cycle.

Section E

Instructional content

Full lecture notes with figures and governing equations

Mat Foundations: from proposal statement to engineering product

Designs a mat (raft) foundation for a structure with high loads or poor/variable bearing soil. That single sentence hides the substance of the module: rigid vs, and modulus of subgrade reaction ks and its estimation. Both must be established from project evidence before anything downstream is credible.

In geotechnical engineering, this work is the input to the subsurface interpretation and foundation recommendation. Differential settlement control across the mat — which is why this page asks you to record the source of every quantity, not just its value. The design of record that drawings, quantities and cost are generated from depends on it.

  • Rigid vs. flexible mat analysis methods (conventional rigid method vs. finite element/Winkler)
  • Modulus of subgrade reaction ks and its estimation
  • Differential settlement control across the mat
  • Punching shear checks at heavily loaded columns
  • Mat thickness and two-way reinforcement design
FIGURE 1FillSand, SPT N=18Soft clay, su=600 psfDense sand / bedrock1Mat thickness2Column loads3Modulus of subgrade react…4Differential settlement5Punching shear zone6Reinforcement mat
Figure 1. Mat Foundations — annotated engineering schematic showing the governing quantities carried through this module.Read this figure alongside the theory block: every labelled quantity must appear in your calculation package with a unit and a source.
Truck-mounted drill rig taking a soil boring beside a bridge, with sample jars in the foreground.

Photo 1. Mat Foundations: from proposal statement to engineering product in practice — Subsurface investigation: SPT samples and the boring log that every geotechnical number traces back to.

Capstone Studio instructional photograph

Governing relationships and how they are applied here

The relationships below govern mat foundations. ks = qallow/Δallow (approx.) or from plate load test — each is valid only inside the parameter range this project occupies, so state that range before substituting.

Modulus of subgrade reaction ks and its estimation sets the values you place into these expressions. Any code-prescribed factor must match ACI 318-19 (2019); a factor lifted from a different edition silently changes the answer.

ks = qallow/Δallow (approx.) or from plate load test

  • Modulus of subgrade reaction used in beam-on-elastic-foundation / finite element mat models
Truck-mounted drill rig taking a soil boring beside a bridge, with sample jars in the foreground.

Photo 2. Governing relationships and how they are applied here in practice — Subsurface investigation: SPT samples and the boring log that every geotechnical number traces back to.

Capstone Studio instructional photograph

Constraints, adopted standards and the safety case for mat foundations

ACI 318-19 (2019), Ch. 13, governs this module: Mat foundation design provisions

The safety case is explicit here. The failure mode is settlement, bearing failure or slope instability below the finished grade; the people exposed are adjacent property owners, excavation crews and the geotechnical engineer of record; the control that prevents it is mat thickness and two-way reinforcement design together with an independent check by someone who did not perform the work.

  • Controlling criterion for this module: rigid vs.
  • Adopted reference: ACI 318-19 (2019) — cite Ch. 13 by number.
  • Failure mode guarded: settlement, bearing failure or slope instability below the finished grade.
  • Evidence produced: Mat foundation design calculation with subgrade modulus basis and differential settlement estimate..
FIGURE 2Confirm inputs and sourcesSelect governing standardAnalyze / designCheck units and equilibriumIndependent checkAccept or revise
Figure 2. Mat Foundations — professional workflow from inputs through acceptance.The revise loop is normal. Reviewers expect to see it in your version history.
Truck-mounted drill rig taking a soil boring beside a bridge, with sample jars in the foreground.

Photo 3. Constraints, adopted standards and the safety case for mat foundations in practice — Subsurface investigation: SPT samples and the boring log that every geotechnical number traces back to.

Capstone Studio instructional photograph

Where this method stops being valid

Every method has a domain of validity. State the range of geometry, loading, material behaviour or flow regime over which your approach holds, and state what you would do instead beyond it.

For this project, the boundary you are most likely to push is mat thickness and two-way reinforcement design. If you cross it, say so in writing, bound the error, and carry the limitation into your results chapter. A disclosed limitation is professional practice; a silent extrapolation is not.

Truck-mounted drill rig taking a soil boring beside a bridge, with sample jars in the foreground.

Photo 4. Where this method stops being valid in practice — Subsurface investigation: SPT samples and the boring log that every geotechnical number traces back to.

Capstone Studio instructional photograph

Section F

Engineering workflow

Steps

  1. 1. Assemble the inputs this module needs — rigid vs; modulus of subgrade reaction ks and its estimation — each with a unit and a source record.
  2. 2. Confirm ACI 318-19 (2019) is the adopted edition and locate Ch. 13.
  3. 3. State the assumptions and the acceptance criterion for rigid vs.
  4. 4. Evaluate ks = qallow/Δallow (approx.) or from plate load test term by term, carrying one extra significant figure.
  5. 5. Test the result against differential settlement control across the mat.
  6. 6. Audit units and run an order-of-magnitude check by hand before the number leaves your desk.
  7. 7. Obtain an independent check from a teammate who did not perform the work, and record their name and date.
  8. 8. Assemble mat foundation design calculation with subgrade modulus basis and differential settlement estimate. and submit it to the geotechnical reviewer for the owner for review.

Decision points

  • Is every input behind rigid vs traceable? If not — stop and collect the record.
  • Does the result satisfy modulus of subgrade reaction ks and its estimation? If not — revise the work, never the criterion.
  • Would the correction change the design of record that drawings, quantities and cost are generated from? If yes — raise a change-control request before proceeding.

Quality checklist

  • Documented: rigid vs
  • Documented: modulus of subgrade reaction ks and its estimation
  • Documented: differential settlement control across the mat
  • ACI 318-19 Ch. 13 cited by section number
  • Units audited on every expression
  • Acceptance criterion recorded before the result
  • Independent check signed and dated
  • Mat foundation design calculation with subgrade modulus basis and differential settlement estimate. attached and named per the course convention

Section H

Interactive visualization

Mat Foundations — step-through

Advance one frame at a time. Each frame adds one engineering decision to the previous state.

Stepwise reveal

Step 1 of 6

Start from the confirmed inputs: geometry, materials, loads or flows, each with a source.

Section I

Applicable codes and standards

ACI 318-19

2019 · Ch. 13

Adopted design/analysis reference governing this module.

Relevance: Mat foundation design provisions

Reference the section number and edition in your calculation package. Do not reproduce code text.

Section J

Worked examples

Full engineering solution format

Section K

Common mistakes and how to avoid them

  • Treating rigid vs as a given instead of establishing it from a project record.
  • Producing mat foundation design calculation with subgrade modulus basis and differential settlement estimate. without showing how modulus of subgrade reaction ks and its estimation was satisfied.
  • Substituting into ks = qallow/Δallow (approx.) or from plate load test outside the range where it is valid, and reporting the number anyway.
  • Missing mat thickness and two-way reinforcement design, which is exactly the path to settlement, bearing failure or slope instability below the finished grade.
  • Designing to the average condition when the governing condition is the controlling one.
  • Freezing a design before the constructability and access review that would have changed it.
  • Carrying an assumption forward after the governing condition changed, without re-checking the result.
  • Reporting numbers without units, or mixing US customary and SI inside a single calculation chain.
  • Citing the wrong edition of a standard, or citing a standard that does not govern the jurisdiction.

Section L

Industry case study

Millennium Tower Settlement (San Francisco, 2016–present)

High-rise on a combined mat/pile foundation over soft soils

Official findings

  • Investigation found the mat/pile system under-predicted long-term settlement given the site's soft Bay Mud and nearby dewatering

Field observations

  • The controlling assumption was documented nowhere in the design record.
  • No independent check existed at the stage where the error entered the work.

Engineering interpretation

  • Interpretation below is student analysis for instructional purposes, not an official finding.
  • Map the failure to a step in your own workflow and state where your process would have caught it.

Lessons learned

  • Mat and deep foundation designs for tall structures require conservative, well-documented settlement predictions with monitoring

Source: Summarize the published investigation; cite it in your reference list. Do not reproduce copyrighted report text.

Section M

FE Civil exam connection

Handbook FE Reference Handbook — geotechnical engineering section (record the section number from your handbook edition).

Exam topics

geotechnical engineering fundamentals

Handbook formulas

  • ks = qallow/Δallow (approx.) or from plate load test

Weak results here feed your FE Civil Academy weak-area queue for targeted practice.

Question 1 of 2

Score: 0/2

In mat foundations, which item must be established BEFORE the analysis is run?

Section N

Apply it to your project — Mat Foundations

Complete this using your own capstone project data. Every field is saved to your project record and routed to your advisor with this module's submission.

Inputs and sources

Every value needs a traceable source.

QuantityValueUnitSource / record

Assumptions and consequences

AssumptionBasisConsequence if wrong

Self-check before submission

Section O

Design challenge

Consulting challenge — Mat Foundations

Your firm has been retained to deliver the mat foundations scope for a municipal client on a compressed schedule. Produce the technical position your firm would defend at a public meeting.

Client request: The client wants a defensible recommendation, the basis of design, and an honest statement of what remains unresolved.

Constraints

  • Adopted local code edition governs; no exceptions without written variance.
  • Budget and schedule are fixed; scope changes require change control.
  • Public safety and accessibility requirements are non-negotiable.

Deliverables

  • One-page basis of design
  • Supporting calculation extract
  • Risk and limitation statement

Evaluation

  • Technical correctness
  • Standard compliance
  • Clarity of engineering judgment
  • Honest treatment of uncertainty

Section P

Documentation workspace

Write the report section for this module in the academic editor

Loading editor…
0 words

Section Q

File uploads

Accepted: PDF, DOCX, XLSX, CSV, PNG, JPG, ZIP, PLAXIS

No files uploaded yet.

Section R

Deliverable and advisor review

Mat foundation design calculation with subgrade modulus basis and differential settlement estimate.

Engineering design
Technical analysis
Code compliance
Calculation quality
Drawings

Submissions route to your assigned faculty advisor and are scored independently by faculty and administrator rubrics.

Reflection

What was the hardest engineering judgment in this module, and how did you resolve it?

Section S

ABET outcome mapping

SO 1
CE-PC1
reinforced

Mat foundation design calculation with subgrade modulus basis and differential settlement estimate. with advisor review and dual scoring.

Assessment: Faculty rubric score and administrator rubric score on this module's submission.

Rubric: Engineering design · Target: 70% of students at or above 'meets expectations'.

Section T

References and further study

standard

ACI 318-19 (2019)

Adopted reference — cite section numbers, do not reproduce text.

template

Mat Foundations — instructor design procedure

Course template for the calculation package format expected in the final report appendix.

manual

NCEES FE Reference Handbook

Locate the equations used here and note the handbook section for exam recall.

template

Advisor meeting agenda item

Bring the unresolved decision from this module to your next weekly advisor meeting.

Week 5 · Mat foundation design calculation with subgrade modulus basis and differential settlement estimate.