Design
Week 4
geotechnical
Geotechnical Design Office
Capstone II dashboard

Combined Footings

Designs a combined footing supporting two or more columns where individual footings would overlap or an edge condition governs.

Section progress

0% of the workflow complete

Geotechnical Engineering · Soil properties, foundation selection, bearing, settlement, earth pressure and slope stability.

Deliverable: Combined footing design calculation with resultant/centroid alignment check.

Minimum tables, figures and equations for Combined Footings

Tables — at least 7

  • Table — trial sections or sizes considered, with the capacity of each and the selection decision
  • Table — final selected geometry for every element: dimensions, thickness, grade, spacing, elevation
  • Table — bearing capacity and footing or pile size at each location
  • Table — ultimate limit state check summary: demand, capacity, ratio, pass or fail, governing clause
  • Table — serviceability check summary: deflection, crack width, settlement, freeboard or velocity against its limit
  • Table — factors of safety achieved against the factor required, per failure mode
  • Table — settlement (immediate and consolidation) against the tolerable limit

Figures — at least 4

  • Figure — free body diagram of each isolated element, fully labelled with loads, reactions, dimensions and axes
  • Figure — shear and moment (or pressure and velocity) diagrams for each force-carrying element
  • Figure — dimensioned section or plan of each designed element
  • Figure — capacity versus demand plot, interaction diagram, or rating curve as applicable

Equations — at least 8

  • Equation — equilibrium equations written out for each free body (sum of forces and sum of moments, or continuity and energy)
  • Equation — the internal force relations V(x) and M(x), or the momentum/thrust relation, used to compute each element's demand
  • Equation — the resulting demand at the critical section of each element, with numeric substitution
  • Equation — the capacity expression for each element type, shown with full numeric substitution and units
  • Equation — the sizing criterion that sets the final dimension (for example required area, depth or diameter)
  • Equation — each limit state check written as demand over capacity with numbers substituted
  • Equation — the factor of safety calculation for each failure mode checked
  • Equation — sliding, overturning, bearing and global stability factors of safety

Number every table and figure (Table 4.x, Figure 4.x), caption it, and refer to it by number in your text. Number displayed equations and show the substitution with units. These counts are minimums — add whatever else your design needs.

Engineering documentation standard — required in every Chapter 4 subsection

These rules are graded on every subsection. Work that misses them is capped on technical accuracy, exhibits, codes and communication, whatever the quality of the prose.

Code and standard references

  • Every requirement, factor, coefficient, limit and allowable you apply cites the governing document AND the exact section, article or sub-article number — e.g. ACI 318-19 §22.5.5.1, AISC 360-22 Chapter J, Section J3.6, AASHTO LRFD 10th Ed. Article 3.6.1.2.2, ASCE 7-22 §12.8.1, ASTM D2487, state DOT manual section, local stormwater manual chapter.
  • Give the edition or year of every document the first time it appears, then use a consistent short form.
  • Where a code equation is used, quote the equation number (e.g. Eq. 22.5.5.1) next to your displayed equation.
  • Where you depart from a code provision, state the clause you are departing from and the engineering justification.
  • List every code, standard and manual actually used in a Codes and Standards table at the start of the subsection.

Citations for statements

  • Every statement of fact, value taken from elsewhere, material property, soil parameter, rainfall depth, unit cost or published method carries an in-text citation (APA) to its source.
  • Field and lab data cite the report, boring log, gauge, survey file or test number and its date.
  • Manufacturer data cites the product literature and revision date; software results cite the program, version and model file name.
  • Uncited assertions are treated as assumptions and must appear in the assumptions table with a justification.
  • Every in-text citation resolves to a full entry in the reference list.

Step-by-step calculations

  • Structure every calculation the same way: (1) objective, (2) governing code clause, (3) equation in symbolic form with the equation number, (4) definition of each symbol, (5) numerical substitution, (6) result with units, (7) comparison against the limit and the pass/fail statement.
  • Show the substitution line — never jump from the formula to the answer.
  • Number displayed equations sequentially (Eq. 4.1, 4.2, …) and refer to them by number in the text.
  • State the load or flow combination governing each calculation by name.
  • Carry consistent significant figures and round only at the reported result; state the rounding convention once.
  • Present repetitive element checks in a calculation table with one row per element and the same column order throughout.

Free body diagrams and figures

  • Draw a separate free body diagram for each isolated element — no combined sketches standing in for several members.
  • Dimension every FBD: span, depth, thickness, cover, eccentricity, embedment, slope, pipe diameter, wall height — with the dimension lines and values shown.
  • Label every force, pressure, reaction and moment with its symbol, magnitude and units, and show the sign convention and coordinate axes.
  • Show supports and boundary conditions explicitly (pin, roller, fixed, elastic, buoyant, hydrostatic).
  • Accompany each FBD with its shear, moment, thrust, pressure or hydraulic grade diagram at the same scale reference.
  • Number and caption every figure (Figure 4.x) and refer to it by number in the narrative; add a scale or north arrow to plans.

Units and notation

  • Every number in text, tables, figures and equations carries its unit — no bare numbers.
  • Use one unit system throughout (US customary or SI); if both appear, give the converted value in parentheses consistently.
  • Check dimensional homogeneity of each equation and say so — the units of both sides must match.
  • Provide a nomenclature table defining every symbol with its unit.

Checking and verification

  • Every calculation is checked by an independent route — hand check against software, alternative method, order-of-magnitude estimate, or a published worked example — and the check is shown, not just claimed.
  • Report demand-to-capacity ratios and factors of safety against the required values, with the source clause for each required value.
  • Include a verification/checking table: item, method of check, expected, obtained, difference, accept or revise.
  • Sanity-check every result (magnitude, direction, plausibility) and state the conclusion.
  • Record who checked the work and on what date; flag anything still unverified as an open item.
  • State limitations and the range over which the result is valid.

How to complete this section

0 words saved

Do this next: Read the Combined Footings lecture and the worked example so you know what "Combined footing design calculation with resultant/centroid alignment check." has to contain.

Not sure how to start or how much depth is expected? Read the fully written model example for this deliverable first — it shows the structure, tables and level of justification your advisor grades against.

Geotechnical Design Office — what this workspace teaches

Soil properties, foundation selection, bearing, settlement, earth pressure and slope stability.

  • Reading boring logs and building a design soil profile
  • Soil classification, index properties and strength parameters
  • Shallow foundation bearing capacity (Terzaghi, Meyerhof) and factors of safety
  • Immediate, consolidation and secondary settlement
  • Lateral earth pressure: at-rest, active, passive; Rankine and Coulomb
  • Retaining wall stability: sliding, overturning, bearing, global
  • Deep foundations: pile capacity, skin friction, end bearing, group effects
  • Slope stability methods and required factors of safety
  • Ground improvement and groundwater control

End-of-term milestones

  • Tuesday, November 17, 2026 — Poster printed and ready. 36 in × 48 in poster finalized and printed one week before the November 24 showcase.
  • Wednesday, November 18, 2026 — Final document package uploaded for scoring. Chapters 4–5, calculation package, drawings and appendices uploaded in the app for advisor scoring.
  • Wednesday, November 18, 2026 — Poster presentation to faculty and industry. Wednesday poster session — printed 36 in × 48 in poster presented in person; industry reviewers score communication and impact.
  • Wednesday, November 25, 2026 — Oral presentation and defense (scored). Scored oral presentation and defense held on Wednesday, November 25.
Week 4
geotechnical
Geotechnical

Combined Footings

Designs a combined footing supporting two or more columns where individual footings would overlap or an edge condition governs.

Section B

Engineering story

A real project situation that frames this module

Week 4: combined footings is the item standing between the team and a reviewable subsurface interpretation and foundation recommendation. Designs a combined footing supporting two or more columns where individual footings would overlap or an edge condition governs. Review stalls on a single line: the team cannot show the record behind rectangular vs.

The team treats resultant load location matched to footing centroid to avoid eccentricity as a background assumption instead of an input that must be established and recorded. The result is settlement, bearing failure or slope instability below the finished grade, discovered only after the design of record that drawings, quantities and cost are generated from has already been built on it.

Adjacent property owners, excavation crews and the geotechnical engineer of record carry the consequence. On this module specifically, the exposure runs through shear and moment diagrams for the combined footing as a continuous beam on soil, and the cost of correction rises every week the subsurface interpretation and foundation recommendation moves closer to issue.

Decisions the engineer must make

  • What record establishes rectangular vs, and is that record in the project data inventory?
  • Which adopted document governs this decision, and who confirmed it applies in this jurisdiction?
  • What is the acceptance criterion for resultant load location matched to footing centroid to avoid eccentricity, and was it written before the result was known?
  • Is x̄ = ΣPi·xi/ΣPi valid over the parameter range this project actually occupies?
  • If the check fails, does the team revise the subsurface interpretation and foundation recommendation or raise a change request against the locked baseline?
Truck-mounted drill rig taking a soil boring beside a bridge, with sample jars in the foreground.

Photo 1. Subsurface investigation: SPT samples and the boring log that every geotechnical number traces back to.

Capstone Studio instructional photograph

Section C

Why this matters

Professional

Combined Footings is judged on whether an independent engineer can follow your reasoning to the same conclusion. Your combined footing design calculation with resultant/centroid alignment check. is the evidence that they can.

Technical

Rectangular vs is what makes x̄ = ΣPi·xi/ΣPi usable on this project rather than a formula copied from a reference. Get it wrong and every quantity derived from it is wrong by the same factor.

Safety

The failure mode this module guards against is settlement, bearing failure or slope instability below the finished grade. It reaches people through differential settlement compatibility between adjacent columns, which is why the safety check is recorded explicitly here rather than inferred from a passing strength or performance check.

Economic

The design of record that drawings, quantities and cost are generated from is priced from this work. Quantities, unit costs and schedule float all trace to rectangular vs; a late correction here is paid for as a change order, not a redline.

Environmental

Environmentally, this module fixes spoil handling, dewatering discharge and groundwater drawdown near the site. Choosing conservatively without justification is not free — the excess shows up as material, energy and land that the project consumes for no measurable gain.

Community

Neighbors whose structures, utilities and streets sit within the zone of influence inherit whatever this module decides — performance, accessibility, cost of ownership and resilience are set here, not at the ribbon-cutting.

Section D

Learning objectives

By the end of this module you will be able to:

  1. 1.Apply rectangular vs, using this project's own conditions rather than a textbook case.
  2. 2.Compare resultant load location matched to footing centroid to avoid eccentricity, using this project's own conditions rather than a textbook case.
  3. 3.Analyze shear and moment diagrams for the combined footing as a continuous beam on soil, using this project's own conditions rather than a textbook case.
  4. 4.Justify strap (cantilever) footing alternative for edge column conditions, using this project's own conditions rather than a textbook case.
  5. 5.Compute the governing quantity from x̄ = ΣPi·xi/ΣPi, with a unit audit on every term.
  6. 6.Produce combined footing design calculation with resultant/centroid alignment check. at a standard the geotechnical reviewer for the owner would accept without a second revision cycle.

Section E

Instructional content

Full lecture notes with figures and governing equations

Reading combined footings as a practising engineer

Designs a combined footing supporting two or more columns where individual footings would overlap or an edge condition governs. That single sentence hides the substance of the module: rectangular vs, and resultant load location matched to footing centroid to avoid eccentricity. Both must be established from project evidence before anything downstream is credible.

In geotechnical engineering, this work is the input to the subsurface interpretation and foundation recommendation. Shear and moment diagrams for the combined footing as a continuous beam on soil — which is why this page asks you to record the source of every quantity, not just its value. The design of record that drawings, quantities and cost are generated from depends on it.

  • Rectangular vs. trapezoidal combined footing geometry for balanced bearing pressure
  • Resultant load location matched to footing centroid to avoid eccentricity
  • Shear and moment diagrams for the combined footing as a continuous beam on soil
  • Strap (cantilever) footing alternative for edge column conditions
  • Differential settlement compatibility between adjacent columns
FIGURE 1FillSand, SPT N=18Soft clay, su=600 psfDense sand / bedrock1Column 1 load2Column 2 load3Resultant location4Footing centroid5Bearing pressure diagram6Moment diagram
Figure 1. Combined Footings — annotated engineering schematic showing the governing quantities carried through this module.Read this figure alongside the theory block: every labelled quantity must appear in your calculation package with a unit and a source.
Truck-mounted drill rig taking a soil boring beside a bridge, with sample jars in the foreground.

Photo 1. Reading combined footings as a practising engineer in practice — Subsurface investigation: SPT samples and the boring log that every geotechnical number traces back to.

Capstone Studio instructional photograph

Governing relationships and how they are applied here

The relationships below govern combined footings. x̄ = ΣPi·xi/ΣPi — each is valid only inside the parameter range this project occupies, so state that range before substituting.

Resultant load location matched to footing centroid to avoid eccentricity sets the values you place into these expressions. Any prescribed factor must be traced to the document your jurisdiction adopted, not to a lecture slide.

x̄ = ΣPi·xi/ΣPi

  • Centroid location for sizing a combined footing to balance bearing pressure
Truck-mounted drill rig taking a soil boring beside a bridge, with sample jars in the foreground.

Photo 2. Governing relationships and how they are applied here in practice — Subsurface investigation: SPT samples and the boring log that every geotechnical number traces back to.

Capstone Studio instructional photograph

Constraints, adopted standards and the safety case for combined footings

No single code section governs this module, so the constraint set comes from the approved proposal, the owner's requirements and professional practice. Write those constraints down; an unwritten constraint is not enforceable at review.

The safety case is explicit here. The failure mode is settlement, bearing failure or slope instability below the finished grade; the people exposed are adjacent property owners, excavation crews and the geotechnical engineer of record; the control that prevents it is differential settlement compatibility between adjacent columns together with an independent check by someone who did not perform the work.

  • Controlling criterion for this module: rectangular vs.
  • Adopted reference: confirm with the jurisdiction before you rely on it.
  • Failure mode guarded: settlement, bearing failure or slope instability below the finished grade.
  • Evidence produced: Combined footing design calculation with resultant/centroid alignment check..
FIGURE 2Confirm inputs and sourcesSelect governing standardAnalyze / designCheck units and equilibriumIndependent checkAccept or revise
Figure 2. Combined Footings — professional workflow from inputs through acceptance.The revise loop is normal. Reviewers expect to see it in your version history.
Truck-mounted drill rig taking a soil boring beside a bridge, with sample jars in the foreground.

Photo 3. Constraints, adopted standards and the safety case for combined footings in practice — Subsurface investigation: SPT samples and the boring log that every geotechnical number traces back to.

Capstone Studio instructional photograph

Where this method stops being valid

Every method has a domain of validity. State the range of geometry, loading, material behaviour or flow regime over which your approach holds, and state what you would do instead beyond it.

For this project, the boundary you are most likely to push is differential settlement compatibility between adjacent columns. If you cross it, say so in writing, bound the error, and carry the limitation into your results chapter. A disclosed limitation is professional practice; a silent extrapolation is not.

Truck-mounted drill rig taking a soil boring beside a bridge, with sample jars in the foreground.

Photo 4. Where this method stops being valid in practice — Subsurface investigation: SPT samples and the boring log that every geotechnical number traces back to.

Capstone Studio instructional photograph

Section F

Engineering workflow

Steps

  1. 1. Assemble the inputs this module needs — rectangular vs; resultant load location matched to footing centroid to avoid eccentricity — each with a unit and a source record.
  2. 2. Confirm which document governs, and record who verified that it applies here.
  3. 3. State the assumptions and the acceptance criterion for rectangular vs.
  4. 4. Evaluate x̄ = ΣPi·xi/ΣPi term by term, carrying one extra significant figure.
  5. 5. Test the result against shear and moment diagrams for the combined footing as a continuous beam on soil.
  6. 6. Audit units and run an order-of-magnitude check by hand before the number leaves your desk.
  7. 7. Obtain an independent check from a teammate who did not perform the work, and record their name and date.
  8. 8. Assemble combined footing design calculation with resultant/centroid alignment check. and submit it to the geotechnical reviewer for the owner for review.

Decision points

  • Is every input behind rectangular vs traceable? If not — stop and collect the record.
  • Does the result satisfy resultant load location matched to footing centroid to avoid eccentricity? If not — revise the work, never the criterion.
  • Would the correction change the design of record that drawings, quantities and cost are generated from? If yes — raise a change-control request before proceeding.

Quality checklist

  • Documented: rectangular vs
  • Documented: resultant load location matched to footing centroid to avoid eccentricity
  • Documented: shear and moment diagrams for the combined footing as a continuous beam…
  • Governing document cited
  • Units audited on every expression
  • Acceptance criterion recorded before the result
  • Independent check signed and dated
  • Combined footing design calculation with resultant/centroid alignment check. attached and named per the course convention

Section H

Interactive visualization

Combined Footings — step-through

Advance one frame at a time. Each frame adds one engineering decision to the previous state.

Stepwise reveal

Step 1 of 6

Start from the confirmed inputs: geometry, materials, loads or flows, each with a source.

Section I

Applicable codes and standards

Section J

Worked examples

Full engineering solution format

Section K

Common mistakes and how to avoid them

  • Treating rectangular vs as a given instead of establishing it from a project record.
  • Producing combined footing design calculation with resultant/centroid alignment check. without showing how resultant load location matched to footing centroid to avoid eccentricity was satisfied.
  • Substituting into x̄ = ΣPi·xi/ΣPi outside the range where it is valid, and reporting the number anyway.
  • Missing differential settlement compatibility between adjacent columns, which is exactly the path to settlement, bearing failure or slope instability below the finished grade.
  • Designing to the average condition when the governing condition is the controlling one.
  • Freezing a design before the constructability and access review that would have changed it.
  • Referencing figures, tables, or sources that never appear in the reference list.
  • Carrying an assumption forward after the governing condition changed, without re-checking the result.
  • Reporting numbers without units, or mixing US customary and SI inside a single calculation chain.

Section L

Industry case study

Documented failure related to combined footings

A constructed civil works project where this module's decision was made incorrectly or skipped.

Official findings

  • Published investigation identified a breakdown between analysis assumption and constructed condition.

Field observations

  • The controlling assumption was documented nowhere in the design record.
  • No independent check existed at the stage where the error entered the work.

Engineering interpretation

  • Interpretation below is student analysis for instructional purposes, not an official finding.
  • Map the failure to a step in your own workflow and state where your process would have caught it.

Lessons learned

  • Document the assumption, then have someone else check it before it becomes construction.

Source: Summarize the published investigation; cite it in your reference list. Do not reproduce copyrighted report text.

Section M

FE Civil exam connection

Handbook FE Reference Handbook — geotechnical engineering section (record the section number from your handbook edition).

Exam topics

geotechnical engineering fundamentals

Handbook formulas

  • x̄ = ΣPi·xi/ΣPi

Weak results here feed your FE Civil Academy weak-area queue for targeted practice.

Question 1 of 2

Score: 0/2

In combined footings, which item must be established BEFORE the analysis is run?

Section N

Apply it to your project — Combined Footings

Complete this using your own capstone project data. Every field is saved to your project record and routed to your advisor with this module's submission.

Inputs and sources

Every value needs a traceable source.

QuantityValueUnitSource / record

Assumptions and consequences

AssumptionBasisConsequence if wrong

Self-check before submission

Section O

Design challenge

Consulting challenge — Combined Footings

Your firm has been retained to deliver the combined footings scope for a municipal client on a compressed schedule. Produce the technical position your firm would defend at a public meeting.

Client request: The client wants a defensible recommendation, the basis of design, and an honest statement of what remains unresolved.

Constraints

  • Adopted local code edition governs; no exceptions without written variance.
  • Budget and schedule are fixed; scope changes require change control.
  • Public safety and accessibility requirements are non-negotiable.

Deliverables

  • One-page basis of design
  • Supporting calculation extract
  • Risk and limitation statement

Evaluation

  • Technical correctness
  • Standard compliance
  • Clarity of engineering judgment
  • Honest treatment of uncertainty

Section P

Documentation workspace

Write the report section for this module in the academic editor

Loading editor…
0 words

Section Q

File uploads

Accepted: PDF, DOCX, XLSX, CSV, PNG, JPG, ZIP

No files uploaded yet.

Section R

Deliverable and advisor review

Combined footing design calculation with resultant/centroid alignment check.

Engineering design
Technical analysis
Code compliance
Calculation quality
Drawings

Submissions route to your assigned faculty advisor and are scored independently by faculty and administrator rubrics.

Reflection

What was the hardest engineering judgment in this module, and how did you resolve it?

Section S

ABET outcome mapping

SO 1
CE-PC1
reinforced

Combined footing design calculation with resultant/centroid alignment check. with advisor review and dual scoring.

Assessment: Faculty rubric score and administrator rubric score on this module's submission.

Rubric: Engineering design · Target: 70% of students at or above 'meets expectations'.

Section T

References and further study

template

Combined Footings — instructor design procedure

Course template for the calculation package format expected in the final report appendix.

manual

NCEES FE Reference Handbook

Locate the equations used here and note the handbook section for exam recall.

template

Advisor meeting agenda item

Bring the unresolved decision from this module to your next weekly advisor meeting.

Week 4 · Combined footing design calculation with resultant/centroid alignment check.