Skip to content
Surveyor operating a total station beside a rural highway with a rod person downstream.

CEGR 492 · Project Management

Project Planner

Field survey: the horizontal and vertical control every alignment and grade later depends on.

Week 8 of 12

Preliminary Engineering Analysis and Design

Demonstrating that the proposal contains genuine engineering work.

Oct 19Oct 25 · deliverables due Oct 25 · est. 10 hrs

Upcoming0%

Instructor note: Show your units on every line. A reviewer should be able to reproduce each number by hand.

Learning objectives

  • Develop preliminary calculations
  • Identify governing equations
  • Use codes correctly
  • Define design checks
  • Interpret calculated results
  • Recognize safety and serviceability requirements

Lecture topics

  • Known and unknown variables
  • Assumptions
  • Governing equations
  • Code references
  • Load combinations
  • Safety factors and limit states
  • Verification checks
  • Design documentation
© 2026 Civil Engineering Capstone Studio. All rights reserved.