Skip to content
Surveyor operating a total station beside a rural highway with a rod person downstream.

CEGR 492 · Project Management

Project Planner

Field survey: the horizontal and vertical control every alignment and grade later depends on.

Week 7 of 12

Methodology Selection

Selecting a defensible process for completing the project.

Oct 12Oct 18 · deliverables due Oct 18 · est. 8 hrs

Upcoming0%

Instructor note: Your methodology must trace one-to-one back to your objectives. Any orphan stage gets cut.

Learning objectives

  • Select an appropriate methodology
  • Explain methodology stages
  • Match methods to objectives
  • Distinguish verification from validation
  • Identify required inputs and outputs

Lecture topics

  • Design methodology
  • Experimental methodology
  • Numerical modeling and finite element analysis
  • Field investigation
  • Survey research and case-study methods
  • Machine learning and optimization
  • Mixed methods
  • Verification and validation
© 2026 Civil Engineering Capstone Studio. All rights reserved.