Skip to content
Surveyor operating a total station beside a rural highway with a rod person downstream.

CEGR 492 · Project Management

Project Planner

Field survey: the horizontal and vertical control every alignment and grade later depends on.

Week 9 of 12

Validation, Risk, Safety, Sustainability, and Constructability

Demonstrating that the proposed solution can be evaluated and implemented responsibly.

Oct 26Nov 1 · deliverables due Nov 1 · est. 8 hrs

Upcoming0%

Instructor note: Name the three risks most likely to sink your project — and how you would detect each one early.

Learning objectives

  • Develop validation methods
  • Identify technical risks
  • Evaluate safety
  • Consider sustainability
  • Assess constructability
  • Identify uncertainty

Lecture topics

  • Verification versus validation
  • Sensitivity analysis
  • Risk assessment
  • Engineering safety
  • Resilience
  • Sustainability and life-cycle thinking
  • Constructability
  • Quality assurance and uncertainty
© 2026 Civil Engineering Capstone Studio. All rights reserved.