Skip to content
Surveyor operating a total station beside a rural highway with a rod person downstream.

CEGR 492 · Project Management

Project Planner

Field survey: the horizontal and vertical control every alignment and grade later depends on.

Week 6 of 12

Literature Review Planning and Source Evaluation

Finding, evaluating, organizing, and synthesizing technical literature.

Oct 5Oct 11 · deliverables due Oct 11 · est. 8 hrs

Upcoming0%

Instructor note: Synthesis means comparing sources against each other — not summarizing them one at a time.

Learning objectives

  • Search engineering databases
  • Evaluate source credibility
  • Distinguish summary from synthesis
  • Organize themes
  • Identify methods and findings
  • Use citation-management tools

Lecture topics

  • Google Scholar
  • ASCE Library
  • TRID
  • FHWA resources
  • AISC, ACI, AASHTO, ASTM
  • USACE, FEMA, EPA
  • Citation ethics
  • Plagiarism avoidance
© 2026 Civil Engineering Capstone Studio. All rights reserved.