CEGR 493 · Change Control
Submit and track formal change requests against the accepted baseline.
Baseline change control — CEGR 493
Once the CEGR 493 baseline is accepted, scope, objectives, methodology and team changes require a written request with technical, schedule, cost and safety impact.
Change requests on record
No change requests submitted yet. The locked baseline stands as approved.
Approved changes update the baseline used by every CEGR 493 design check.
Course workspace: CEGR 493 — Capstone II