Skip to content
Interior of a steel and glass pedestrian bridge showing the structural framing.

CEGR 492 · Chapter 1 — Proposal Development

Alignment Review

Structural framing of a pedestrian bridge: members, connections and the load path a designer must trace.

Alignment Review

Problem → gap → objectives → research questions → scope → significance must tell one consistent story.

Problem → gap → objectives → research questions → scope → significance must tell one consistent story. This studio checks traceability across every Chapter 1 section.

Advisors flag proposals where a later section drifts from the problem or gap stated earlier.

Overall alignment score

0%

© 2026 Civil Engineering Capstone Studio. All rights reserved.