Field Investigation and Site Assessment Studio
Plan safe, permitted, repeatable field work with instruments, accuracy targets and contingency.
Plan safe, permitted, repeatable field work with instruments, accuracy targets and contingency.
Learning objectives
- Write a field procedure another team could follow
- Build a safety plan and hazard controls
- Define measurement accuracy and recording
Engineering guidance
No field visit is planned until the safety plan, access permission and contingency date exist.
FE Civil connection
Surveying
Handbook §12 — Field measurement (placeholder)
- What closure error is acceptable for a traverse?
- How is instrument calibration documented?
- What PPE applies to roadway data collection?
Technical methodology planner
Plan Chapter 3 against the exact equations, standards, data sources and design checks you will execute in Capstone II.