Skip to content
Interior of a steel and glass pedestrian bridge showing the structural framing.

CEGR 492 · Proposal Completion · Approval and Submission

Peer Review

Structural framing of a pedestrian bridge: members, connections and the load path a designer must trace.

Peer Review Workspace

Exchange structured peer comments using a review rubric and respond to each item.

Exchange structured peer comments using a review rubric and respond to each item.

What you will accomplish

  • Give specific feedback
  • Categorize comments
  • Respond professionally

Engineering guidance

  • Comment on the document, never on the person.

FE Civil connection

Topic: Professional practice

Handbook: Ethics and Professional Practice

Practice this topic
© 2026 Civil Engineering Capstone Studio. All rights reserved.