Skip to content
Surveyor operating a total station beside a rural highway with a rod person downstream.

CEGR 492 · Course Administration

Course Workspace

Field survey: the horizontal and vertical control every alignment and grade later depends on.

CEGR 492
Proposal Development
Fall 2026
Section 001

CEGR 492 · Semester Plan

Graded items, milestones and review gates for CEGR 492 — Capstone I, Fall 2026.

CEGR 492 — Capstone IFall 2026 plan

19 graded items, 5 milestones. Modules open Monday 12:00 AM and work is due Sunday 11:59 PM (America/New_York).

Week 1

  • Orientation Completion
  • Topic Selection Memo

Calendar: Capstone I orientation · Advisor orientation meeting

Week 2

Milestone

Topic approved

  • Problem Identification Package

Week 3

  • Background and Significance
  • Objectives and Scope

Week 4

Milestone

Chapter 1 accepted

  • Chapter 1 Draft

Calendar: Chapter 1 draft due

Week 5

  • Literature Search Log
  • Synthesis Matrix

Week 6

Milestone

Chapter 2 accepted

  • Research Gap Statement
  • Chapter 2 Draft

Calendar: Chapter 2 draft due

Week 7

  • Methodology Framework

Calendar: Methodology review

Week 8

  • Data Collection Plan
  • Analysis and Design Procedure

Week 9

Milestone

Chapter 3 accepted

  • Chapter 3 Draft

Calendar: Chapter 3 draft due

Week 10

  • Capstone II Execution Schedule
  • Integrated Proposal Draft

Calendar: Integrated proposal draft due

Week 11

  • Proposal Presentation

Calendar: Proposal presentation

Week 12

Milestone

Proposal approved

  • Final Proposal
  • ABET Evidence Portfolio

Calendar: Final proposal deadline

Course workspace: CEGR 492 — Capstone I

© 2026 Civil Engineering Capstone Studio. All rights reserved.