Settlement and Improvement

Subsurface investigation: SPT samples and the boring log that every geotechnical number traces back to.

Phase VI · Engineering Design Studio · Week 5–8

Settlement and Ground Improvement Studio

Predict immediate, consolidation and secondary settlement and select ground improvement when limits are exceeded.

Terzaghi consolidation theory
FHWA ground improvement
Module progress0%

Settlement / improvement cases designed

0

Checks passing

0

0 checks recorded

Open warnings

0

No settlement / improvement case yet

Add a settlement / improvement case to record its inputs, capacity and governing check.

Learning objectives

  • Compute consolidation settlement
  • Estimate time rate
  • Select ground improvement

Engineering judgment

  • Differential settlement damages structures, total settlement rarely does.
  • Check time rate against schedule.

Governing standards

  • NAVFAC DM-7

    Soil Mechanics and Foundations

    Bearing capacity, earth pressure, slope stability

    DM-7.01
    DM-7.02

FE Civil connection

Consolidation

Handbook section: Geotechnical

Practice this FE topic

Recommended next step

Slope Stability and Excavation Studio

Analyze slope stability, temporary excavation support, dewatering and construction safety requirements.

Continue