Skip to content
Signalized urban street junction with traffic signals, markings and parked vehicles.

CEGR 492 · Engineering Design Studio · Transportation Engineering

Parking and Multimodal

Signalized junction — the operational unit measured by delay, level of service and conflict exposure.

Phase VI · Engineering Design Studio · Week 6–9

Parking and Multimodal Facility Studio

Design parking supply, circulation, transit access, bicycle and pedestrian facilities and ADA compliance.

ITE Parking Generation
ADA Standards
NACTO
Module progress0%

Facility elements designed

0

Checks passing

0

0 checks recorded

Open warnings

0

No facility element yet

Add a facility element to record its inputs, capacity and governing check.

Learning objectives

  • Size parking demand
  • Design circulation
  • Design accessible routes

Engineering judgment

  • Peak demand is not average demand times a factor.
  • ADA compliance is a legal minimum.

Governing standards

  • AASHTO Green Book

    A Policy on Geometric Design of Highways and Streets

    Alignment, sight distance, cross-section

    Ch. 3 Elements
    Ch. 5–8 Design
  • HCM 7

    Highway Capacity Manual

    Capacity and level of service

    Vol. 2 Uninterrupted
    Vol. 3 Interrupted
  • AASHTO 1993

    Guide for Design of Pavement Structures

    Flexible and rigid pavement thickness design

    Part II Design

FE Civil connection

Site design

Handbook section: Transportation

Practice this FE topic

Recommended next step

Hydrology and Watershed Studio

Delineate the watershed and compute design storms, runoff, times of concentration and peak flows.

Continue
© 2026 Civil Engineering Capstone Studio. All rights reserved.