Skip to content
Reinforcing steel and formwork placed in an excavated bridge footing.

CEGR 492 · Engineering Design Studio · Construction and Technology

Drawings and Detailing

Footing reinforcement and formwork before placement — the physical form of a bearing-capacity calculation.

Phase VI · Engineering Design Studio · Week 8–11

Drawings and Detailing Studio

Produce and check plan, section, detail and schedule sheets with proper annotation and revision control.

National CAD Standard
ACI 315
AISC detailing
Sheet set completeness0%

Sheets in register

0

QA completeness

0%

Open warnings

0

Sheet-set completeness

0% of QA checklist items complete across 0 sheet(s).

Suggested minimum sheet set by discipline

Reference set — adapt numbering to your project's discipline prefix.

structural

  • S-001 Cover / general notes
  • S-101 Foundation plan
  • S-201 Framing plans
  • S-301 Elevations
  • S-401 Sections
  • S-501 Typical details
  • S-601 Connection schedule

geotechnical

  • G-001 Boring location plan
  • G-101 Subsurface profile
  • G-201 Foundation recommendations

No sheets yet

Add a drawing sheet to start the register.

Learning objectives

  • Build the drawing set
  • Annotate correctly
  • Run drawing checks

Engineering judgment

  • Drawings communicate the design; calculations only justify it.
  • Every dimension must be buildable.

FE Civil connection

Engineering drawings

Handbook section: Professional Practice

Practice this FE topic

Module activities

Design warnings (1)

  • No drawing sheets started yet.

Recommended next step

Design Alternatives and Optimization Studio

Compare feasible alternatives on cost, constructability, performance, sustainability and risk, then justify selection.

Continue