Phase VI · Engineering Design Studio · Week 8–11
Construction Planning and Cost Studio
Plan construction sequencing, methods, temporary works, productivity, equipment and schedule.
Construction activitys designed
0
Checks passing
0
0 checks recorded
Open warnings
0
No construction activity yet
Add a construction activity to record its inputs, capacity and governing check.
Learning objectives
- Sequence construction activities
- Select methods and equipment
- Estimate durations
Engineering judgment
- Sequencing errors cost more than design errors.
- Temporary works are engineered works.
Governing standards
OSHA 29 CFR 1926
Construction Safety Standards
Excavation, fall protection, temporary works
Subpart P ExcavationSubpart M FallsEnvision v3
Sustainable Infrastructure Framework
Sustainability credits and scoring
Quality of LifeResource AllocationClimate and Resilience
Recommended next step
Materials and Laboratory Design Studio
Specify materials and plan the laboratory testing program that validates design assumptions.
Continue